Greenfield (KING PLANT - MAXWELL)

Greenfield

Washington County, Minnesota · MISO

DC Readiness
60.5
Good / 100

Greenfield (KING PLANT - MAXWELL) is a greenfield datacenter candidate site in Washington County, Minnesota, interconnecting through MISO. It screens at 60.5/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationKING PLANT
Substation voltage345 kV
Available capacity600 MW

Speed to power

ISO / RTO regionMISO
Queue depth10
Avg queue wait2.8 yrs

Connectivity

Nearest IXPDataBank Minneapolis (MSP2)
IXP distance11.7 mi
Fiber providers10
Fiber coverage34.7%

Site characteristics

Site typeGreenfield
Land contactWashington County County Assessor

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score75/100

Location context

Nearest datacenterDatacenter 1454573842
DC distance11.5 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.49¢/kWh
Industrial electricity9.39¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$11,320

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
59
Speed to power15%
52
Fiber connectivity12%
57
Energy cost10%
50
Water risk8%
92
Natural hazard8%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Washington County, ranked by DC Readiness.

Sites near Greenfield (KING PLANT - MAXWELL)
SiteTypeVoltageCapacityQueue waitScore
KING PLANTSubstation-Adjacent345 kV600 MW2.8 yrs64.6
Washington County Landfill (MN)Brownfield115 kV0 MW2.8 yrs61.4
UNKNOWN129312Substation-Adjacent115 kV100 MW2.8 yrs61.3
WOODBURYSubstation-Adjacent115 kV100 MW2.8 yrs61.1
LONG LAKESubstation-Adjacent115 kV100 MW2.8 yrs61.0
AFTONSubstation-Adjacent115 kV100 MW2.8 yrs60.0
UNKNOWN129310Substation-Adjacent115 kV100 MW2.8 yrs60.0
UNKNOWN132866Substation-Adjacent115 kV100 MW2.8 yrs59.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (KING PLANT - MAXWELL), Washington County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.