ICO Central Entrance

Industrial

St. Louis County, Minnesota · MISO

DC Readiness
43.8
Fair / 100

ICO Central Entrance is a industrial datacenter candidate site in St. Louis County, Minnesota, interconnecting through MISO. It screens at 43.8/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionMISO
Queue depth16

Connectivity

Nearest IXP421 N 6th Ave East
IXP distance1.5 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenter421 N 6th Ave East
DC distance1.5 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity14.97¢/kWh
Industrial electricity8.39¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$3,927

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
49
Fiber connectivity12%
33
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
100
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in St. Louis County, ranked by DC Readiness.

Sites near ICO Central Entrance
SiteTypeVoltageCapacityQueue waitScore
FORBESSubstation-Adjacent500 kV1,000 MW1.4 yrs71.1
UNKNOWN129374Substation-Adjacent115 kV100 MW1.4 yrs67.6
UNKNOWN129315Substation-Adjacent115 kV100 MW1.4 yrs67.3
UNKNOWN129377Substation-Adjacent230 kV300 MW1.4 yrs67.0
TAP134727Substation-Adjacent115 kV100 MW1.4 yrs67.0
UNKNOWN129400Substation-Adjacent115 kV100 MW1.4 yrs66.9
UNKNOWN129383Substation-Adjacent115 kV100 MW1.4 yrs66.8
OZ St. LouisGreenfield1.4 yrs66.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ICO Central Entrance, St. Louis County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.