Skip to content
Gridcensus

BNSF at Spirit Landing

Industrial

St. Louis County, Minnesota · MISO

DC Readiness
54.7
Fair / 100

At a glance

BNSF at Spirit Landing is an industrial datacenter candidate site in St. Louis County, Minnesota, scoring 54.7/100 DC Readiness — 89th of 179 scored sites in the county. It sits in the MISO grid region and the ALLETE, INC. service territory, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

UtilityALLETE, INC.investor ownedmoderate to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth127
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPDuluth Missabe
IXP distance6.3 mi
Fiber providers15
Fiber coverage29.6%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterDuluth Missabe
DC distance6.3 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity14.97¢/kWh
Industrial electricity8.39¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$3,927

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; large-load tariffs emerging.

DC tax incentiveYes
Large-load threshold≥ 50 MW

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track BNSF at Spirit Landing

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does BNSF at Spirit Landing compare with other sites in St. Louis County?

BNSF at Spirit Landing ranks 89th of 179 scored candidate sites in St. Louis County. Its 54.7/100 is roughly in line with the county average of 53.7. It is roughly in line with the Minnesota average of 55.7 and roughly in line with the national average of 53.2.

Against the Minnesota average, its strongest sub-score is fiber connectivity (79 vs 70) and its weakest is power availability (30 vs 39). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is BNSF at Spirit Landing to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is Duluth Missabe at 6.3 miles. 15 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Duluth Missabe, 6.3 miles away.

What are the flood, water and hazard risks at BNSF at Spirit Landing?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). At the county level, FEMA's National Risk Index rates St. Louis County "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
48
Fiber connectivity12%
79
Energy cost10%
50
Water risk7%
92
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in St. Louis County, ranked by DC Readiness.

Sites near BNSF at Spirit Landing
SiteTypeVoltageCapacityQueue waitScore
OZ St. LouisGreenfield——4.3 yrs65.2
FORBESSubstation-Adjacent500 kV1,000 MW4.3 yrs65.2
OZ St. LouisGreenfield——4.3 yrs64.0
UNKNOWN129377Substation-Adjacent230 kV300 MW4.3 yrs61.1
SHANNONSubstation-Adjacent230 kV300 MW4.3 yrs60.0
Greenfield (ROSEAU COUNTY - FORBES)Greenfield500 kV1,000 MW4.3 yrs59.0
Greenfield (FORBES - CHISAGO)Greenfield500 kV1,000 MW4.3 yrs58.3
UNKNOWN130349Substation-Adjacent115 kV100 MW4.3 yrs57.4

BNSF at Spirit Landing: common questions

What is the DC Readiness score of BNSF at Spirit Landing?

BNSF at Spirit Landing scores 54.7/100 on the GridCensus DC Readiness scale, rated fair. It ranks 89th of 179 scored sites in St. Louis County. The St. Louis County average is 53.7 and the Minnesota average is 55.7.

Which electric utility serves BNSF at Spirit Landing?

ALLETE, INC. (investor owned) holds the retail service territory that contains the site; its holding company is MINNESOTA POWER INC.

What grid region is BNSF at Spirit Landing in?

BNSF at Spirit Landing is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

Is BNSF at Spirit Landing in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

How far is BNSF at Spirit Landing from an internet exchange?

The nearest internet exchange facility is Duluth Missabe, about 6.3 miles away; 15 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “BNSF at Spirit Landing, St. Louis County, MN”, https://gridcensus.com/datacenter-sites/minnesota/st-louis-county/bnsf-at-spirit-landing-10bf7ce9 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for BNSF at Spirit Landing, St. Louis County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.