ROCHESTER/RACINE MINNESOTA

Federal Excess

Mower County, Minnesota · PJM

DC Readiness
54.3
Fair / 100

ROCHESTER/RACINE MINNESOTA is a federal excess datacenter candidate site in Mower County, Minnesota, interconnecting through PJM. It screens at 54.3/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityPEOPLE'S COOPERATIVE SERVICEScooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPNP Rochester
IXP distance17.7 mi
Fiber providers8
Fiber coverage81.2%

Site characteristics

Acreage31 ac
Buildable load (est.)~12–31 MWland-based
Former useNavigation and Traffic Aids

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterNP Rochester
DC distance17.7 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.55¢/kWh
Industrial electricity9.10¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$8,240

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; large-load tariffs emerging.

DC tax incentiveYes
Large-load threshold≥ 50 MW

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track ROCHESTER/RACINE MINNESOTA

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
45
Fiber connectivity12%
71
Energy cost10%
50
Water risk7%
92
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Mower County, ranked by DC Readiness.

Sites near ROCHESTER/RACINE MINNESOTA
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN130234Substation-Adjacent345 kV600 MW2.8 yrs64.1
ADAMSSubstation-Adjacent345 kV600 MW2.8 yrs62.6
OZ MowerGreenfield——1.4 yrs62.1
UNKNOWN129322Substation-Adjacent161 kV100 MW2.8 yrs59.6
Greenfield (PLEASANT VALLEY (MN) - ADAMS)Greenfield345 kV600 MW6.9 yrs59.6
UNKNOWN162881Substation-Adjacent161 kV100 MW2.8 yrs59.6
UNKNOWN157962Substation-Adjacent69 kV50 MW2.8 yrs57.0
UNKNOWN129301Substation-Adjacent69 kV50 MW2.8 yrs56.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ROCHESTER/RACINE MINNESOTA, Mower County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.