Hutchinson City Dump

Industrial

McLeod, Minnesota · MISO

DC Readiness
51.3
Fair / 100

At a glance

Hutchinson City Dump is an industrial datacenter candidate site in McLeod, Minnesota, scoring 51.3/100 DC Readiness — 37th of 38 scored sites in the county. It sits in the MISO grid region, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth127
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPNP Belle Plaine (MSP1)
IXP distance33.5 mi
Fiber providers11
Fiber coverage57.2%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterNP Belle Plaine (MSP1)
DC distance33.5 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.72¢/kWh
Industrial electricity9.41¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$7,217

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; large-load tariffs emerging.

DC tax incentiveYes
Large-load threshold≥ 50 MW

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Hutchinson City Dump

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Hutchinson City Dump compare with other sites in McLeod?

Hutchinson City Dump ranks 37th of 38 scored candidate sites in McLeod. Its 51.3/100 is roughly in line with the county average of 56.0. It is roughly in line with the Minnesota average of 55.7 and roughly in line with the national average of 53.2.

Against the Minnesota average, its strongest sub-score is natural hazard (75 vs 74) and its weakest is power availability (30 vs 39). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Hutchinson City Dump to power, fiber and other datacenters?

The nearest located transmission bottleneck is West_Memphis_AT1_161_500kV_flo_Sans_Souci_Driver (MISO), 50 miles away. For connectivity, the nearest internet exchange facility is NP Belle Plaine (MSP1) at 33.5 miles. 11 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is NP Belle Plaine (MSP1), 33.5 miles away.

What are the flood, water and hazard risks at Hutchinson City Dump?

At the county level, FEMA's National Risk Index rates McLeod "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
48
Fiber connectivity12%
63
Energy cost10%
50
Water risk7%
92
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in McLeod, ranked by DC Readiness.

Sites near Hutchinson City Dump
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN129735Substation-Adjacent230 kV300 MW4.3 yrs62.4
EC Near GlencoeGreenfield——4.3 yrs61.1
EC Near GlencoeGreenfield——4.3 yrs60.5
Hutchinson LandfillBrownfield69 kV0 MW4.3 yrs59.7
EC Near GlencoeGreenfield——4.3 yrs59.3
EC Near GlencoeGreenfield——4.3 yrs59.3
EC Near Hutchinson Plant #1Greenfield——4.3 yrs59.1
EC Near GlencoeGreenfield——4.3 yrs58.0

Hutchinson City Dump: common questions

What is the DC Readiness score of Hutchinson City Dump?

Hutchinson City Dump scores 51.3/100 on the GridCensus DC Readiness scale, rated fair. It ranks 37th of 38 scored sites in McLeod. The McLeod average is 56.0 and the Minnesota average is 55.7.

What grid region is Hutchinson City Dump in?

Hutchinson City Dump is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

How far is Hutchinson City Dump from an internet exchange?

The nearest internet exchange facility is NP Belle Plaine (MSP1), about 33.5 miles away; 11 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Hutchinson City Dump, McLeod, MN”, https://gridcensus.com/datacenter-sites/minnesota/mcleod/hutchinson-city-dump-ce3dedf3 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Hutchinson City Dump, McLeod is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.