Substation-Adjacent site at 43.559, -92.020

Substation-Adjacent

Fillmore, Minnesota · MISO

DC Readiness
52.1
Fair / 100

At a glance

Substation-Adjacent site at 43.559, -92.020 is a substation-adjacent datacenter candidate site in Fillmore, Minnesota, scoring 52.1/100 DC Readiness — 26th of 34 scored sites in the county. Its nearest substation is TAP138014 (0 mi, 69 kV). It sits in the MISO grid region and the MIENERGY COOPERATIVE service territory, where interconnection has averaged 4.3 years from request to operation. GridCensus catalogs 50 MW of candidate capacity here.

Power & interconnection

Nearest substationTAP138014
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityMIENERGY COOPERATIVEcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth127
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPNP Rochester
IXP distance38.8 mi
Fiber providers8
Fiber coverage68.6%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterNP Rochester
DC distance38.8 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.54¢/kWh
Industrial electricity8.52¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$5,919

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; large-load tariffs emerging.

DC tax incentiveYes
Large-load threshold≥ 50 MW

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP138014

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Substation-Adjacent site at 43.559, -92.020 compare with other sites in Fillmore?

Substation-Adjacent site at 43.559, -92.020 ranks 26th of 34 scored candidate sites in Fillmore. Its 52.1/100 is roughly in line with the county average of 54.6. It is roughly in line with the Minnesota average of 55.7 and roughly in line with the national average of 53.2.

Against the Minnesota average, its strongest sub-score is power availability (46 vs 39) and its weakest is fiber connectivity (37 vs 70). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Substation-Adjacent site at 43.559, -92.020 to power, fiber and other datacenters?

The nearest mapped substation, TAP138014, is about 0 miles away and operates at 69 kV. For connectivity, the nearest internet exchange facility is NP Rochester at 38.8 miles. 8 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is NP Rochester, 38.8 miles away.

What are the flood, water and hazard risks at Substation-Adjacent site at 43.559, -92.020?

At the county level, FEMA's National Risk Index rates Fillmore "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
48
Fiber connectivity12%
37
Energy cost10%
50
Water risk7%
92
Natural hazard6%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Fillmore, ranked by DC Readiness.

Sites near Substation-Adjacent site at 43.559, -92.020
SiteTypeVoltageCapacityQueue waitScore
EC Near LanesboroGreenfield——4.3 yrs58.6
EC Near LanesboroGreenfield——4.3 yrs58.4
EC Near LanesboroGreenfield——4.3 yrs57.6
UNKNOWN131055Substation-Adjacent69 kV50 MW4.3 yrs57.2
UNKNOWN129278Substation-Adjacent69 kV50 MW4.3 yrs57.1
EC Near LanesboroGreenfield——4.3 yrs56.9
EC Near LanesboroGreenfield——4.3 yrs56.5
EC Near LanesboroGreenfield——4.3 yrs56.3

Substation-Adjacent site at 43.559, -92.020: common questions

What is the DC Readiness score of Substation-Adjacent site at 43.559, -92.020?

Substation-Adjacent site at 43.559, -92.020 scores 52.1/100 on the GridCensus DC Readiness scale, rated fair. It ranks 26th of 34 scored sites in Fillmore. The Fillmore average is 54.6 and the Minnesota average is 55.7.

What is the nearest substation to Substation-Adjacent site at 43.559, -92.020?

The nearest mapped substation is TAP138014, about 0 miles away, at 69 kV. GridCensus catalogs 50 MW of candidate capacity for the site.

Which electric utility serves Substation-Adjacent site at 43.559, -92.020?

MIENERGY COOPERATIVE (cooperative) holds the retail service territory that contains the site; its holding company is TRI-COUNTY ELECTRIC COOP.

What grid region is Substation-Adjacent site at 43.559, -92.020 in?

Substation-Adjacent site at 43.559, -92.020 is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

How far is Substation-Adjacent site at 43.559, -92.020 from an internet exchange?

The nearest internet exchange facility is NP Rochester, about 38.8 miles away; 8 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Substation-Adjacent site at 43.559, -92.020, Fillmore, MN”, https://gridcensus.com/datacenter-sites/minnesota/fillmore/tap138014-ef4725c8 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Substation-Adjacent site at 43.559, -92.020, Fillmore is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.