Skip to content
Gridcensus

Shimdeldecker Property

Industrial

Van Buren County, Michigan · PJM

DC Readiness
54.4
Fair / 100

At a glance

Shimdeldecker Property is an industrial datacenter candidate site in Van Buren County, Michigan, scoring 54.4/100 DC Readiness — 41st of 77 scored sites in the county. It sits in the PJM grid region and the MIDWEST ENERGY COOPERATIVE service territory, where interconnection has averaged 2.2 years from request to operation.

Power & interconnection

UtilityMIDWEST ENERGY COOPERATIVEcooperativefavorable to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 2.2 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionPJM
Queue depth129
Avg queue wait2.2 yrs
Recent queue wait2.2 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPMidwest Energy & Communications
IXP distance22.5 mi
Fiber providers15
Fiber coverage72.6%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterMidwest Energy & Communications
DC distance22.5 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity10.40¢/kWh
Industrial electricity5.12¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$6,341

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Shimdeldecker Property

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Shimdeldecker Property compare with other sites in Van Buren County?

Shimdeldecker Property ranks 41st of 77 scored candidate sites in Van Buren County. Its 54.4/100 is roughly in line with the county average of 55.2. It is roughly in line with the Michigan average of 55.2 and roughly in line with the national average of 53.2.

Against the Michigan average, its strongest sub-score is fiber connectivity (77 vs 68) and its weakest is power availability (30 vs 34). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Shimdeldecker Property to power, fiber and other datacenters?

The nearest located transmission bottleneck is AEPCE01_ROXANA_13835_A (MISO), 79 miles away. For connectivity, the nearest internet exchange facility is Midwest Energy & Communications at 22.5 miles. 15 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Midwest Energy & Communications, 22.5 miles away.

What are the flood, water and hazard risks at Shimdeldecker Property?

At the county level, FEMA's National Risk Index rates Van Buren County "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
51
Fiber connectivity12%
77
Energy cost10%
50
Water risk7%
94
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Van Buren County, ranked by DC Readiness.

Sites near Shimdeldecker Property
SiteTypeVoltageCapacityQueue waitScore
BENTON HARBORSubstation-Adjacent345 kV600 MW2.2 yrs66.1
UNKNOWN173428Substation-Adjacent345 kV600 MW2.2 yrs64.8
PALISADESSubstation-Adjacent345 kV600 MW2.2 yrs64.7
HARTFORDSubstation-Adjacent138 kV100 MW2.2 yrs60.7
AEP EAST WATERVLIETSubstation-Adjacent138 kV100 MW2.2 yrs60.6
UNKNOWN128788Substation-Adjacent138 kV100 MW2.2 yrs60.2
UNKNOWN129046Substation-Adjacent138 kV100 MW2.2 yrs60.1
UNKNOWN129130Substation-Adjacent138 kV100 MW2.2 yrs60.1

Shimdeldecker Property: common questions

What is the DC Readiness score of Shimdeldecker Property?

Shimdeldecker Property scores 54.4/100 on the GridCensus DC Readiness scale, rated fair. It ranks 41st of 77 scored sites in Van Buren County. The Van Buren County average is 55.2 and the Michigan average is 55.2.

Which electric utility serves Shimdeldecker Property?

MIDWEST ENERGY COOPERATIVE (cooperative) holds the retail service territory that contains the site.

What grid region is Shimdeldecker Property in?

Shimdeldecker Property is in the PJM region. Projects interconnecting there have averaged a 2.2-year wait from queue request to operation.

How far is Shimdeldecker Property from an internet exchange?

The nearest internet exchange facility is Midwest Energy & Communications, about 22.5 miles away; 15 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Shimdeldecker Property, Van Buren County, MI”, https://gridcensus.com/datacenter-sites/michigan/van-buren-county/shimdeldecker-property-9743a760 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Shimdeldecker Property, Van Buren County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.