Substation-Adjacent site at 41.820, -86.317

Substation-Adjacent

ST JOSEPH, Michigan · PJM

DC Readiness
59.2
Good / 100

At a glance

Substation-Adjacent site at 41.820, -86.317 is a substation-adjacent datacenter candidate site in ST JOSEPH, Michigan, scoring 59.2/100 DC Readiness — 28th of 316 scored sites in the county. Its nearest substation is UNKNOWN129529 (0 mi, 69 kV). It sits in the PJM grid region and the MIDWEST ENERGY COOPERATIVE service territory, where interconnection has averaged 2.2 years from request to operation. GridCensus catalogs 50 MW of candidate capacity here.

Power & interconnection

Nearest substationUNKNOWN129529
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityMIDWEST ENERGY COOPERATIVEcooperativefavorable to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 2.2 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionPJM
Queue depth129
Avg queue wait2.2 yrs
Recent queue wait2.2 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPGAP Union Station
IXP distance10.9 mi
Fiber providers14
Fiber coverage68.4%

Site characteristics

Land contactSt. Joseph County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score68/100

Location context

Nearest datacenterGAP Union Station
DC distance10.9 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.77¢/kWh
Industrial electricity8.04¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$8,309

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN129529

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Substation-Adjacent site at 41.820, -86.317 compare with other sites in ST JOSEPH?

Substation-Adjacent site at 41.820, -86.317 ranks 28th of 316 scored candidate sites in ST JOSEPH. Its 59.2/100 is roughly in line with the county average of 55.1. It is roughly in line with the Michigan average of 55.2 and about 11% above the national average of 53.2.

Against the Michigan average, its strongest sub-score is fiber connectivity (85 vs 68) and its weakest is natural hazard (68 vs 74). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Substation-Adjacent site at 41.820, -86.317 to power, fiber and other datacenters?

The nearest mapped substation, UNKNOWN129529, is about 0 miles away and operates at 69 kV. The nearest located transmission bottleneck is AEPCE01_ROXANA_13835_A (MISO), 61 miles away. For connectivity, the nearest internet exchange facility is GAP Union Station at 10.9 miles. 14 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is GAP Union Station, 10.9 miles away.

What are the flood, water and hazard risks at Substation-Adjacent site at 41.820, -86.317?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). At the county level, FEMA's National Risk Index rates ST JOSEPH "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
51
Fiber connectivity12%
85
Energy cost10%
50
Water risk7%
90
Natural hazard6%
68
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in ST JOSEPH, ranked by DC Readiness.

Sites near Substation-Adjacent site at 41.820, -86.317
SiteTypeVoltageCapacityQueue waitScore
OLIVESubstation-Adjacent345 kV600 MW3.0 yrs70.9
DUMONTSubstation-Adjacent765 kV1,000 MW3.0 yrs67.7
JACKSON ROADSubstation-Adjacent345 kV600 MW3.0 yrs67.0
TWIN BRANCH (345 KV)Substation-Adjacent345 kV600 MW3.0 yrs66.0
OZ St. JosephGreenfield——3.0 yrs64.0
UNKNOWN147721Substation-Adjacent138 kV100 MW3.0 yrs61.5
UNKNOWN122947Substation-Adjacent138 kV100 MW3.0 yrs61.5
UNKNOWN123070Substation-Adjacent138 kV100 MW3.0 yrs61.5

Substation-Adjacent site at 41.820, -86.317: common questions

What is the DC Readiness score of Substation-Adjacent site at 41.820, -86.317?

Substation-Adjacent site at 41.820, -86.317 scores 59.2/100 on the GridCensus DC Readiness scale, rated good. It ranks 28th of 316 scored sites in ST JOSEPH. The ST JOSEPH average is 55.1 and the Michigan average is 55.2.

What is the nearest substation to Substation-Adjacent site at 41.820, -86.317?

The nearest mapped substation is UNKNOWN129529, about 0 miles away, at 69 kV. GridCensus catalogs 50 MW of candidate capacity for the site.

Which electric utility serves Substation-Adjacent site at 41.820, -86.317?

MIDWEST ENERGY COOPERATIVE (cooperative) holds the retail service territory that contains the site.

What grid region is Substation-Adjacent site at 41.820, -86.317 in?

Substation-Adjacent site at 41.820, -86.317 is in the PJM region. Projects interconnecting there have averaged a 2.2-year wait from queue request to operation.

Is Substation-Adjacent site at 41.820, -86.317 in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

How far is Substation-Adjacent site at 41.820, -86.317 from an internet exchange?

The nearest internet exchange facility is GAP Union Station, about 10.9 miles away; 14 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Substation-Adjacent site at 41.820, -86.317, ST JOSEPH, MI”, https://gridcensus.com/datacenter-sites/michigan/st-joseph/unknown129529-1f974768 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Substation-Adjacent site at 41.820, -86.317, ST JOSEPH is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.