15398 220th Avenue

Industrial

Mecosta County, Michigan · MISO

DC Readiness
52.2
Fair / 100

15398 220th Avenue is an industrial datacenter candidate site in Mecosta County, Michigan, interconnecting through MISO. It screens at 52.2/100 DC Readiness and a 2.2 yrs average interconnection-queue wait.

Power & interconnection

UtilityDTE ELECTRIC COMPANYinvestor ownedfavorable to large load · terms ≥ 100 MWLarge-load contract terms; MI DC tax exemption (2025) · 15 yr

Speed to power

Interconnection outlookFavorable
≈ 2.2 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth286
Avg queue wait2.2 yrs
Recent queue wait2.2 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXP123.NET - DC4 - 400 76th St SW
IXP distance60.4 mi
Fiber providers8
Fiber coverage51.2%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterManagedWay BYK1
DC distance60.4 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity12.92¢/kWh
Industrial electricity7.15¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$4,348

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track 15398 220th Avenue

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
54
Fiber connectivity12%
61
Energy cost10%
50
Water risk7%
94
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Mecosta County, ranked by DC Readiness.

Sites near 15398 220th Avenue
SiteTypeVoltageCapacityQueue waitScore
OZ MecostaGreenfield——2.2 yrs58.1
UNKNOWN133929Substation-Adjacent138 kV100 MW2.2 yrs57.6
OZ MecostaGreenfield——2.2 yrs57.5
EC FFE Mecosta CountyGreenfield——2.2 yrs56.1
UNKNOWN138479Substation-Adjacent69 kV50 MW2.2 yrs55.7
UNKNOWN159076Substation-Adjacent69 kV50 MW2.2 yrs55.0
TAP159075Substation-Adjacent69 kV50 MW2.2 yrs54.9
Former Kitson ManufacturingIndustrial——2.2 yrs52.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for 15398 220th Avenue, Mecosta County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.