Skip to content
Gridcensus

Per Clin Orchards, Inc.

Industrial

Manistee County, Michigan · MISO

DC Readiness
49.9
Fair / 100

At a glance

Per Clin Orchards, Inc. is an industrial datacenter candidate site in Manistee County, Michigan, scoring 49.9/100 DC Readiness — 43rd of 55 scored sites in the county. It sits in the MISO grid region and the CONSUMERS ENERGY CO service territory, where interconnection has averaged 2.2 years from request to operation.

Power & interconnection

UtilityCONSUMERS ENERGY COinvestor ownedfavorable to large load · terms ≥ 100 MWLarge-load contract terms; MI DC sales/use-tax exemption (2025) · 15 yr

Speed to power

Interconnection outlookFavorable
≈ 2.2 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth286
Avg queue wait2.2 yrs
Recent queue wait2.2 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPEthoplex Edge DC - Green Bay
IXP distance90.2 mi
Fiber providers5
Fiber coverage22.4%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterEthoplex Edge DC - Green Bay
DC distance90.2 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity10.35¢/kWh
Industrial electricity7.12¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$4,308

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Per Clin Orchards, Inc.

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Per Clin Orchards, Inc. compare with other sites in Manistee County?

Per Clin Orchards, Inc. ranks 43rd of 55 scored candidate sites in Manistee County. Its 49.9/100 is roughly in line with the county average of 52.1. It is roughly in line with the Michigan average of 55.2 and roughly in line with the national average of 53.2.

Against the Michigan average, its strongest sub-score is natural hazard (75 vs 74) and its weakest is fiber connectivity (48 vs 68). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Per Clin Orchards, Inc. to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is Ethoplex Edge DC - Green Bay at 90.2 miles. 5 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Ethoplex Edge DC - Green Bay, 90.2 miles away.

What are the flood, water and hazard risks at Per Clin Orchards, Inc.?

At the county level, FEMA's National Risk Index rates Manistee County "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
54
Fiber connectivity12%
48
Energy cost10%
50
Water risk7%
94
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Manistee County, ranked by DC Readiness.

Sites near Per Clin Orchards, Inc.
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN128300Substation-Adjacent138 kV100 MW2.2 yrs59.0
EC Near TES Filer City StationGreenfield——2.2 yrs58.4
EC Near TES Filer City StationGreenfield——2.2 yrs58.2
EC Near TES Filer City StationGreenfield——2.2 yrs58.0
EC Near TES Filer City StationGreenfield——2.2 yrs57.8
UNKNOWN133164Substation-Adjacent138 kV100 MW2.2 yrs57.2
TAP144737Substation-Adjacent138 kV100 MW2.2 yrs57.0
UNKNOWN128881Substation-Adjacent138 kV100 MW2.2 yrs56.7

Per Clin Orchards, Inc.: common questions

What is the DC Readiness score of Per Clin Orchards, Inc.?

Per Clin Orchards, Inc. scores 49.9/100 on the GridCensus DC Readiness scale, rated fair. It ranks 43rd of 55 scored sites in Manistee County. The Manistee County average is 52.1 and the Michigan average is 55.2.

Which electric utility serves Per Clin Orchards, Inc.?

CONSUMERS ENERGY CO (investor owned) holds the retail service territory that contains the site; its holding company is CMS ENERGY CORPORATION.

What grid region is Per Clin Orchards, Inc. in?

Per Clin Orchards, Inc. is in the MISO region. Projects interconnecting there have averaged a 2.2-year wait from queue request to operation.

How far is Per Clin Orchards, Inc. from an internet exchange?

The nearest internet exchange facility is Ethoplex Edge DC - Green Bay, about 90.2 miles away; 5 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Per Clin Orchards, Inc., Manistee County, MI”, https://gridcensus.com/datacenter-sites/michigan/manistee-county/per-clin-orchards-inc-31858f8a (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Per Clin Orchards, Inc., Manistee County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.