DC Readiness
50.8
Fair / 100

Harbor Heights Project is an industrial datacenter candidate site in Leelanau County, Michigan, interconnecting through PJM. It screens at 50.8/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityDTE ELECTRIC COMPANYinvestor ownedfavorable to large load · terms ≥ 100 MWLarge-load contract terms; MI DC tax exemption (2025) · 15 yr

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth17
Avg queue wait3.8 yrs

Connectivity

Nearest IXPEthoplex Edge DC - Green Bay
IXP distance123.8 mi
Fiber providers6
Fiber coverage49.2%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterEthoplex Edge DC - Green Bay
DC distance123.8 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity9.90¢/kWh
Industrial electricity7.25¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$10,286

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Harbor Heights Project

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
41
Fiber connectivity12%
59
Energy cost10%
50
Water risk7%
94
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Leelanau County, ranked by DC Readiness.

Sites near Harbor Heights Project
SiteTypeVoltageCapacityQueue waitScore
EC FFE Leelanau CountyGreenfield——2.2 yrs55.0
M-22 Log HomeIndustrial——3.8 yrs51.3
Norris School RedevelopmentIndustrial——3.8 yrs51.2
Norris SchoolIndustrial——3.8 yrs51.2
Former Norris SchoolIndustrial——3.8 yrs51.2
Orchardview PropertyIndustrial——3.8 yrs51.2
Morgan PreserveIndustrial——3.8 yrs51.2
Mine SiteFormer Mine——3.8 yrs51.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Harbor Heights Project, Leelanau County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.