Skip to content
Gridcensus

Crystal Flash

Industrial

Ionia County, Michigan · MISO

DC Readiness
53.3
Fair / 100

At a glance

Crystal Flash is an industrial datacenter candidate site in Ionia County, Michigan, scoring 53.3/100 DC Readiness — 32nd of 39 scored sites in the county. It sits in the MISO grid region and the DTE ELECTRIC COMPANY service territory, where interconnection has averaged 2.2 years from request to operation.

Power & interconnection

UtilityDTE ELECTRIC COMPANYinvestor ownedfavorable to large load · terms ≥ 100 MWLarge-load contract terms; MI DC tax exemption (2025) · 15 yr

Speed to power

Interconnection outlookFavorable
≈ 2.2 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth286
Avg queue wait2.2 yrs
Recent queue wait2.2 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPUS Signal - Grand Rapids South
IXP distance28.8 mi
Fiber providers7
Fiber coverage41.9%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterManagedWay BYK1
DC distance28.8 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.77¢/kWh
Industrial electricity6.37¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$6,594

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Crystal Flash

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Crystal Flash compare with other sites in Ionia County?

Crystal Flash ranks 32nd of 39 scored candidate sites in Ionia County. Its 53.3/100 is roughly in line with the county average of 55.0. It is roughly in line with the Michigan average of 55.2 and roughly in line with the national average of 53.2.

Against the Michigan average, its strongest sub-score is natural hazard (75 vs 74) and its weakest is fiber connectivity (63 vs 68). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Crystal Flash to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is US Signal - Grand Rapids South at 28.8 miles. 7 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is ManagedWay BYK1, 28.8 miles away.

What are the flood, water and hazard risks at Crystal Flash?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). At the county level, FEMA's National Risk Index rates Ionia County "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
54
Fiber connectivity12%
63
Energy cost10%
50
Water risk7%
94
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Ionia County, ranked by DC Readiness.

Sites near Crystal Flash
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN131571Substation-Adjacent138 kV100 MW2.2 yrs60.0
UNKNOWN145704Substation-Adjacent138 kV100 MW2.2 yrs59.9
TAP145705Substation-Adjacent138 kV100 MW2.2 yrs59.6
UNKNOWN159038Substation-Adjacent138 kV100 MW2.2 yrs59.4
TAP145725Substation-Adjacent69 kV50 MW2.2 yrs58.4
UNKNOWN133930Substation-Adjacent69 kV50 MW2.2 yrs58.4
EC FFE Ionia CountyGreenfield——2.2 yrs57.7
TAP145724Substation-Adjacent69 kV50 MW2.2 yrs57.7

Crystal Flash: common questions

What is the DC Readiness score of Crystal Flash?

Crystal Flash scores 53.3/100 on the GridCensus DC Readiness scale, rated fair. It ranks 32nd of 39 scored sites in Ionia County. The Ionia County average is 55.0 and the Michigan average is 55.2.

Which electric utility serves Crystal Flash?

DTE ELECTRIC COMPANY (investor owned) holds the retail service territory that contains the site; its holding company is DTE ENERGY.

What grid region is Crystal Flash in?

Crystal Flash is in the MISO region. Projects interconnecting there have averaged a 2.2-year wait from queue request to operation.

Is Crystal Flash in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

How far is Crystal Flash from an internet exchange?

The nearest internet exchange facility is US Signal - Grand Rapids South, about 28.8 miles away; 7 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Crystal Flash, Ionia County, MI”, https://gridcensus.com/datacenter-sites/michigan/ionia-county/crystal-flash-0a7249b3 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Crystal Flash, Ionia County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.