UNKNOWN159082

Substation-Adjacent

Ingham County, Michigan · PJM

DC Readiness
60.3
Good / 100

UNKNOWN159082 is a substation-adjacent datacenter candidate site in Ingham County, Michigan, interconnecting through PJM. It screens at 60.3/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN159082
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
UtilityCONSUMERS ENERGY COinvestor ownedfavorable to large load · terms ≥ 100 MWLarge-load contract terms; MI DC sales/use-tax exemption (2025) · 15 yr

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth17
Avg queue wait3.8 yrs

Connectivity

Nearest IXPLiquid Web DC3
IXP distance7.6 mi
Fiber providers14
Fiber coverage75.6%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterLiquid Web
DC distance7.3 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.18¢/kWh
Industrial electricity6.70¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$5,227

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN159082

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
37
Fiber connectivity12%
90
Energy cost10%
50
Water risk7%
94
Natural hazard6%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Ingham County, ranked by DC Readiness.

Sites near UNKNOWN159082
SiteTypeVoltageCapacityQueue waitScore
Burcham Park LandfillBrownfield138 kV0 MW2.8 yrs65.4
EC Near Eckert StationGreenfield——2.2 yrs64.8
UNKNOWN128990Substation-Adjacent138 kV100 MW3.8 yrs64.5
EC Coal Ingham CountyGreenfield——2.2 yrs64.5
EC Near Eckert StationGreenfield——2.2 yrs63.8
OZ InghamGreenfield——2.2 yrs63.2
EC Near Eckert StationGreenfield——2.2 yrs62.7
OZ InghamGreenfield——2.2 yrs62.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN159082, Ingham County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.