Erkkila Building
IndustrialHoughton County, Michigan · MISO
At a glance
Erkkila Building is an industrial datacenter candidate site in Houghton County, Michigan, scoring 52.4/100 DC Readiness — 31st of 35 scored sites in the county. It sits in the MISO grid region and the UPPER PENINSULA POWER COMPANY service territory, where interconnection has averaged 2.2 years from request to operation.
Power & interconnection
Speed to power
Shorter queues and healthier completion here — a faster path to energization than the national norm.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.
Site location
Get alerts
Track Erkkila Building
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Erkkila Building compare with other sites in Houghton County?
Erkkila Building ranks 31st of 35 scored candidate sites in Houghton County. Its 52.4/100 is roughly in line with the county average of 56.2. It is roughly in line with the Michigan average of 55.2 and roughly in line with the national average of 53.2.
Against the Michigan average, its strongest sub-score is natural hazard (75 vs 74) and its weakest is fiber connectivity (48 vs 68). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Erkkila Building to power, fiber and other datacenters?
For connectivity, the nearest internet exchange facility is MI Tech - Main Campus at 10.1 miles. 5 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is MI Tech - Main Campus, 10.1 miles away.
What are the flood, water and hazard risks at Erkkila Building?
At the county level, FEMA's National Risk Index rates Houghton County "Relatively Moderate".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Houghton County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Near Portage | Greenfield | — | — | 2.2 yrs | 60.9 |
| EC Near Portage | Greenfield | — | — | 2.2 yrs | 60.8 |
| OZ Houghton | Greenfield | — | — | 2.2 yrs | 60.6 |
| ATLANTIC | Substation-Adjacent | 138 kV | 100 MW | 2.2 yrs | 60.3 |
| MTU | Substation-Adjacent | 69 kV | 50 MW | 2.2 yrs | 59.9 |
| EC Near Portage | Greenfield | — | — | 2.2 yrs | 59.6 |
| ELEVATION ST | Substation-Adjacent | 69 kV | 50 MW | 2.2 yrs | 59.5 |
| EC Near Portage | Greenfield | — | — | 2.2 yrs | 59.2 |
Erkkila Building: common questions
What is the DC Readiness score of Erkkila Building?
Erkkila Building scores 52.4/100 on the GridCensus DC Readiness scale, rated fair. It ranks 31st of 35 scored sites in Houghton County. The Houghton County average is 56.2 and the Michigan average is 55.2.
Which electric utility serves Erkkila Building?
UPPER PENINSULA POWER COMPANY (investor owned) holds the retail service territory that contains the site; its holding company is INTEGRYS ENERGY GROUP.
What grid region is Erkkila Building in?
Erkkila Building is in the MISO region. Projects interconnecting there have averaged a 2.2-year wait from queue request to operation.
How far is Erkkila Building from an internet exchange?
The nearest internet exchange facility is MI Tech - Main Campus, about 10.1 miles away; 5 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Erkkila Building, Houghton County, MI”, https://gridcensus.com/datacenter-sites/michigan/houghton-county/erkkila-building-9ba4abc4 (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Erkkila Building, Houghton County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.