Emmet County, Michigan · PJM

DC Readiness
51.3
Fair / 100

EVERGREEN is a substation-adjacent datacenter candidate site in Emmet County, Michigan, interconnecting through PJM. It screens at 51.3/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationEVERGREEN
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

ISO / RTO regionPJM
Queue depth17
Avg queue wait3.8 yrs

Connectivity

Fiber providers6
Fiber coverage48.7%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score75/100

Location context

County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity12.01¢/kWh
Industrial electricity7.41¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$5,871

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power15%
41
Fiber connectivity12%
34
Energy cost10%
50
Water risk8%
94
Natural hazard8%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
10
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Emmet County, ranked by DC Readiness.

Sites near EVERGREEN
SiteTypeVoltageCapacityQueue waitScore
StraitsBrownfield20 MW2.2 yrs59.0
EC FFE Emmet CountyGreenfield2.2 yrs58.9
EC Near StraitsGreenfield2.2 yrs57.3
EC Near StraitsGreenfield2.2 yrs56.3
EC Near StraitsGreenfield2.2 yrs54.5
EC Near StraitsGreenfield2.2 yrs54.0
MCGULPINSubstation-Adjacent138 kV100 MW3.8 yrs53.7
MACKINACSubstation-Adjacent138 kV100 MW3.8 yrs53.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.