Skip to content
Gridcensus

Proposed Splash Pad

Industrial

Barry County, Michigan · MISO

DC Readiness
52.4
Fair / 100

At a glance

Proposed Splash Pad is an industrial datacenter candidate site in Barry County, Michigan, scoring 52.4/100 DC Readiness — 25th of 47 scored sites in the county. It sits in the MISO grid region and the CONSUMERS ENERGY CO service territory, where interconnection has averaged 2.2 years from request to operation.

Power & interconnection

UtilityCONSUMERS ENERGY COinvestor ownedfavorable to large load · terms ≥ 100 MWLarge-load contract terms; MI DC sales/use-tax exemption (2025) · 15 yr

Speed to power

Interconnection outlookFavorable
≈ 2.2 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth286
Avg queue wait2.2 yrs
Recent queue wait2.2 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPUS Signal - Grand Rapids South
IXP distance23.0 mi
Fiber providers8
Fiber coverage25.8%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterManagedWay BYK1
DC distance23.0 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity12.61¢/kWh
Industrial electricity6.97¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$6,027

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Proposed Splash Pad

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Proposed Splash Pad compare with other sites in Barry County?

Proposed Splash Pad ranks 25th of 47 scored candidate sites in Barry County. Its 52.4/100 is roughly in line with the county average of 53.8. It is roughly in line with the Michigan average of 55.2 and roughly in line with the national average of 53.2.

Against the Michigan average, its strongest sub-score is natural hazard (75 vs 74) and its weakest is fiber connectivity (56 vs 68). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Proposed Splash Pad to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is US Signal - Grand Rapids South at 23 miles. 8 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is ManagedWay BYK1, 23 miles away.

What are the flood, water and hazard risks at Proposed Splash Pad?

At the county level, FEMA's National Risk Index rates Barry County "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
54
Fiber connectivity12%
56
Energy cost10%
50
Water risk7%
94
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Barry County, ranked by DC Readiness.

Sites near Proposed Splash Pad
SiteTypeVoltageCapacityQueue waitScore
TAP138470Substation-Adjacent138 kV100 MW2.2 yrs61.4
UNKNOWN128524Substation-Adjacent138 kV100 MW2.2 yrs61.1
UNKNOWN129886Substation-Adjacent138 kV100 MW2.2 yrs59.8
UNKNOWN145719Substation-Adjacent69 kV50 MW2.2 yrs59.3
TAP145718Substation-Adjacent69 kV50 MW2.2 yrs58.6
TAP138469Substation-Adjacent69 kV50 MW2.2 yrs57.2
UNKNOWN128402Substation-Adjacent69 kV50 MW2.2 yrs56.9
UNKNOWN128403Substation-Adjacent69 kV50 MW2.2 yrs56.1

Proposed Splash Pad: common questions

What is the DC Readiness score of Proposed Splash Pad?

Proposed Splash Pad scores 52.4/100 on the GridCensus DC Readiness scale, rated fair. It ranks 25th of 47 scored sites in Barry County. The Barry County average is 53.8 and the Michigan average is 55.2.

Which electric utility serves Proposed Splash Pad?

CONSUMERS ENERGY CO (investor owned) holds the retail service territory that contains the site; its holding company is CMS ENERGY CORPORATION.

What grid region is Proposed Splash Pad in?

Proposed Splash Pad is in the MISO region. Projects interconnecting there have averaged a 2.2-year wait from queue request to operation.

How far is Proposed Splash Pad from an internet exchange?

The nearest internet exchange facility is US Signal - Grand Rapids South, about 23 miles away; 8 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Proposed Splash Pad, Barry County, MI”, https://gridcensus.com/datacenter-sites/michigan/barry-county/proposed-splash-pad-6ec67c76 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Proposed Splash Pad, Barry County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.