At a glance
Rivers Edge BP is an industrial datacenter candidate site in Arenac County, Michigan, scoring 50.0/100 DC Readiness — 29th of 34 scored sites in the county. It sits in the MISO grid region and the CONSUMERS ENERGY CO service territory, where interconnection has averaged 2.2 years from request to operation.
Power & interconnection
Speed to power
Shorter queues and healthier completion here — a faster path to energization than the national norm.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.
Site location
Get alerts
Track Rivers Edge BP
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Rivers Edge BP compare with other sites in Arenac County?
Rivers Edge BP ranks 29th of 34 scored candidate sites in Arenac County. Its 50.0/100 is roughly in line with the county average of 51.2. It is roughly in line with the Michigan average of 55.2 and roughly in line with the national average of 53.2.
Against the Michigan average, its strongest sub-score is natural hazard (75 vs 74) and its weakest is fiber connectivity (49 vs 68). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Rivers Edge BP to power, fiber and other datacenters?
For connectivity, the nearest internet exchange facility is Liquid Web DC3 at 104.9 miles. 6 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Datacenter 00755540694, 74.7 miles away.
What are the flood, water and hazard risks at Rivers Edge BP?
At the county level, FEMA's National Risk Index rates Arenac County "Relatively Moderate".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Arenac County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| OZ Arenac | Greenfield | — | — | 2.2 yrs | 59.0 |
| TWINING | Substation-Adjacent | 138 kV | 100 MW | 2.2 yrs | 56.9 |
| UNKNOWN144601 | Substation-Adjacent | 138 kV | 100 MW | 2.2 yrs | 56.9 |
| WHITTEMORE | Substation-Adjacent | 138 kV | 100 MW | 2.2 yrs | 56.7 |
| EC FFE Arenac County | Greenfield | — | — | 2.2 yrs | 51.6 |
| Competitive Machining, Inc | Industrial | — | — | 2.2 yrs | 50.6 |
| Former Shell Station Twining | Industrial | — | — | 2.2 yrs | 50.6 |
| Sterling Area Health Center | Industrial | — | — | 2.2 yrs | 50.6 |
Rivers Edge BP: common questions
What is the DC Readiness score of Rivers Edge BP?
Rivers Edge BP scores 50.0/100 on the GridCensus DC Readiness scale, rated fair. It ranks 29th of 34 scored sites in Arenac County. The Arenac County average is 51.2 and the Michigan average is 55.2.
Which electric utility serves Rivers Edge BP?
CONSUMERS ENERGY CO (investor owned) holds the retail service territory that contains the site; its holding company is CMS ENERGY CORPORATION.
What grid region is Rivers Edge BP in?
Rivers Edge BP is in the MISO region. Projects interconnecting there have averaged a 2.2-year wait from queue request to operation.
How far is Rivers Edge BP from an internet exchange?
The nearest internet exchange facility is Liquid Web DC3, about 104.9 miles away; 6 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Rivers Edge BP, Arenac County, MI”, https://gridcensus.com/datacenter-sites/michigan/arenac-county/rivers-edge-bp-266bca5b (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Rivers Edge BP, Arenac County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.