Alger County, Michigan · PJM

DC Readiness
51.8
Fair / 100

ALGER is a substation-adjacent datacenter candidate site in Alger County, Michigan, interconnecting through PJM. It screens at 51.8/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationALGER
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

ISO / RTO regionPJM
Queue depth17
Avg queue wait3.8 yrs

Connectivity

Nearest IXPMI Tech - Main Campus
IXP distance103.7 mi
Fiber providers4
Fiber coverage65.1%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score75/100

Location context

Nearest datacenterMI Tech - Main Campus
DC distance103.7 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity15.34¢/kWh
Industrial electricity8.31¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$2,348

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power15%
41
Fiber connectivity12%
35
Energy cost10%
50
Water risk8%
94
Natural hazard8%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Alger County, ranked by DC Readiness.

Sites near ALGER
SiteTypeVoltageCapacityQueue waitScore
OZ AlgerGreenfield2.2 yrs56.1
MUNISINGSubstation-Adjacent138 kV100 MW3.8 yrs54.2
HIAWATHA (AD-REA)Substation-Adjacent69 kV50 MW3.8 yrs51.8
TAP171290Substation-Adjacent69 kV50 MW3.8 yrs51.8
TAP171291Substation-Adjacent69 kV50 MW3.8 yrs51.8
Dairy Queen and Chasing FirefliesIndustrial3.8 yrs51.8
SHINGLETONSubstation-Adjacent69 kV50 MW3.8 yrs51.8
FOREST LAKESubstation-Adjacent69 kV50 MW3.8 yrs51.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ALGER, Alger County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.