Skip to content
Gridcensus

Greenfield (TAP139322 - BRIGHTON)

Greenfield

Montgomery, Maryland · PJM

DC Readiness
60.4
Good / 100

Greenfield (TAP139322 - BRIGHTON) is a greenfield datacenter candidate site in Montgomery, Maryland, interconnecting through PJM. It screens at 60.4/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP139322
Substation voltage500 kV
Available capacity1,000 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth308
Avg queue wait3.8 yrs

Connectivity

Nearest IXPAtlantech Online - Rockville, MD
IXP distance16.6 mi
Fiber providers12
Fiber coverage96.7%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterDatacenter 00178331621
DC distance14.3 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_credits)
Commercial electricity9.80¢/kWh
Industrial electricity11.09¢/kWh
Cooling degree days1,300
Heating degree days4,400
Land price / acre$10,739

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone property tax credits; personal property tax credits on DC equipment.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (TAP139322 - BRIGHTON)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
72
Speed to power20%
36
Fiber connectivity12%
84
Energy cost10%
50
Water risk7%
84
Natural hazard6%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
37
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Montgomery, ranked by DC Readiness.

Sites near Greenfield (TAP139322 - BRIGHTON)
SiteTypeVoltageCapacityQueue waitScore
BELLS MILLSubstation-Adjacent230 kV300 MW3.8 yrs64.6
EC Near NIH Cogeneration FacilityGreenfield3.5 yrs63.4
OZ MontgomeryGreenfield3.5 yrs63.4
NORBECKSubstation-Adjacent230 kV300 MW3.8 yrs63.2
OZ MontgomeryGreenfield3.5 yrs63.2
QUINCE ORCHARDSubstation-Adjacent230 kV300 MW3.8 yrs63.2
EC Near NIH Cogeneration FacilityGreenfield3.5 yrs63.1
EC Near NIH Cogeneration FacilityGreenfield3.5 yrs63.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (TAP139322 - BRIGHTON), Montgomery. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.