UNKNOWN122611

Substation-Adjacent

Garrett County, Maryland · PJM

DC Readiness
50.6
Fair / 100

UNKNOWN122611 is a substation-adjacent datacenter candidate site in Garrett County, Maryland, interconnecting through PJM. It screens at 50.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN122611
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW

Speed to power

ISO / RTO regionPJM
Queue depth308
Avg queue wait3.8 yrs

Connectivity

Nearest IXPCitynet Bridgeport
IXP distance48.8 mi
Fiber providers6
Fiber coverage42.0%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterCitynet Bridgeport
DC distance48.8 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_credits)
Commercial electricity8.54¢/kWh
Industrial electricity7.65¢/kWh
Cooling degree days1,300
Heating degree days4,400
Land price / acre$5,541

Incentive detail: Enterprise Zone property tax credits; personal property tax credits on DC equipment.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
30
Fiber connectivity12%
26
Energy cost10%
50
Water risk8%
84
Natural hazard8%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
37
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Garrett County, ranked by DC Readiness.

Sites near UNKNOWN122611
SiteTypeVoltageCapacityQueue waitScore
EC Coal Garrett CountyGreenfield3.5 yrs58.3
EC Coal Garrett CountyGreenfield3.5 yrs58.2
EC Coal Garrett CountyGreenfield3.5 yrs57.9
EC Coal Garrett CountyGreenfield3.5 yrs57.2
EC Coal Garrett CountyGreenfield3.5 yrs56.6
EC Coal Garrett CountyGreenfield3.5 yrs55.7
UNKNOWN108742Substation-Adjacent138 kV100 MW3.8 yrs54.5
Greenfield (HATFIELD - BLACK OAK)Greenfield500 kV1,000 MW3.8 yrs53.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.