Skip to content
Gridcensus

UNKNOWN108742

Substation-Adjacent

Garrett County, West Virginia · PJM

DC Readiness
58.6
Good / 100

UNKNOWN108742 is a substation-adjacent datacenter candidate site in Garrett County, West Virginia, interconnecting through PJM. It screens at 58.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN108742
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth130
Avg queue wait3.8 yrs

Connectivity

Nearest IXPCitynet Bridgeport
IXP distance48.5 mi
Fiber providers6
Fiber coverage42.0%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterCitynet Bridgeport
DC distance48.5 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_credits)
Commercial electricity8.54¢/kWh
Industrial electricity7.65¢/kWh
Cooling degree days1,300
Heating degree days4,400
Land price / acre$5,541

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone property tax credits; personal property tax credits on DC equipment.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN108742

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
54
Fiber connectivity12%
60
Energy cost10%
50
Water risk7%
84
Natural hazard6%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
37
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Garrett County, ranked by DC Readiness.

Sites near UNKNOWN108742
SiteTypeVoltageCapacityQueue waitScore
EC Coal Garrett CountyGreenfield——3.5 yrs58.3
EC Coal Garrett CountyGreenfield——3.5 yrs58.2
EC Coal Garrett CountyGreenfield——3.5 yrs57.9
Greenfield (HATFIELD - BLACK OAK)Greenfield500 kV1,000 MW3.8 yrs57.7
EC Coal Garrett CountyGreenfield——3.5 yrs57.2
EC Coal Garrett CountyGreenfield——3.5 yrs56.6
EC Coal Garrett CountyGreenfield——3.5 yrs55.7
UNKNOWN122914Substation-Adjacent138 kV100 MW3.8 yrs55.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UNKNOWN108742, Garrett County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.