Skip to content
Gridcensus

Knox County, Maine · ISO-NE

DC Readiness
52.9
Fair / 100

TAP136787 is a substation-adjacent datacenter candidate site in Knox County, Maine, interconnecting through ISO-NE. It screens at 52.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP136787
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW

Speed to power

ISO / RTO regionISO-NE
Queue depth83
Avg queue wait3.9 yrs

Connectivity

Nearest IXPUniversity of Maine - Neville Telecom Colo
IXP distance59.4 mi
Fiber providers12
Fiber coverage60.1%

Site characteristics

Risk & environment

Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score85/100

Location context

Nearest datacenterOxford Networks
DC distance41.8 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity13.95¢/kWh
Industrial electricity12.34¢/kWh
Cooling degree days300
Heating degree days7,500
Land price / acre$5,875

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
34
Fiber connectivity12%
33
Energy cost10%
50
Water risk8%
96
Natural hazard8%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Knox County, ranked by DC Readiness.

Sites near TAP136787
SiteTypeVoltageCapacityQueue waitScore
MEADOW ROADSubstation-Adjacent115 kV100 MW3.9 yrs52.9
DRAGON CEMENTSubstation-Adjacent115 kV100 MW3.9 yrs52.9
PARK STREETSubstation-Adjacent115 kV100 MW3.9 yrs52.9
TAP136785Substation-Adjacent115 kV100 MW3.9 yrs52.9
HIGHLANDSubstation-Adjacent115 kV100 MW3.9 yrs52.9
Friendship Plumbing and HeatingIndustrial3.9 yrs51.2
Shafter's JunkyardIndustrial3.9 yrs51.0
Rockland WaterfrontIndustrial3.9 yrs51.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP136787, Knox County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.