W.S. Libby Mill

Industrial

Androscoggin County, Maine · ISO-NE

DC Readiness
42.9
Fair / 100

W.S. Libby Mill is a industrial datacenter candidate site in Androscoggin County, Maine, interconnecting through ISO-NE. It screens at 42.9/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionISO-NE
Queue depth45

Connectivity

Nearest IXPCENTRA PWM1 - Portland, Maine (340 Cumberland)
IXP distance30.4 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterOxford Networks
DC distance20.3 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity13.95¢/kWh
Industrial electricity12.34¢/kWh
Cooling degree days300
Heating degree days7,500
Land price / acre$5,591

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
37
Fiber connectivity12%
54
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Androscoggin County, ranked by DC Readiness.

Sites near W.S. Libby Mill
SiteTypeVoltageCapacityQueue waitScore
LARRABEE ROADSubstation-Adjacent345 kV600 MW3.5 yrs67.9
REENERGY LIVERMORE FALLSSubstation-Adjacent115 kV100 MW3.5 yrs65.4
TAP136745Substation-Adjacent115 kV100 MW3.5 yrs64.3
GULF ISLANDSubstation-Adjacent115 kV100 MW3.5 yrs63.8
Greenfield (SURROWIEC - LARRABEE ROAD)Greenfield345 kV600 MW3.5 yrs63.6
UNKNOWN133734Substation-Adjacent115 kV100 MW3.5 yrs63.4
KIMBALL ROADSubstation-Adjacent115 kV100 MW3.5 yrs63.4
TAP136754Substation-Adjacent115 kV100 MW3.5 yrs62.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for W.S. Libby Mill, Androscoggin County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.