Skip to content
Gridcensus

Androscoggin County, Maine · ISO-NE

DC Readiness
55.5
Good / 100

NORWAY is a substation-adjacent datacenter candidate site in Androscoggin County, Maine, interconnecting through ISO-NE. It screens at 55.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationNORWAY
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityCENTRAL MAINE POWER COinvestor ownedmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookModerate
≈ 3.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionISO-NE
Queue depth13
Avg queue wait3.9 yrs

Connectivity

Nearest IXPFirstLight Regen Hut
IXP distance39.6 mi
Fiber providers8
Fiber coverage64.6%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score85/100

Location context

Nearest datacenterOxford Networks
DC distance37.0 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity13.95¢/kWh
Industrial electricity12.34¢/kWh
Cooling degree days300
Heating degree days7,500
Land price / acre$5,591

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track NORWAY

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
37
Fiber connectivity12%
68
Energy cost10%
50
Water risk7%
96
Natural hazard6%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Androscoggin County, ranked by DC Readiness.

Sites near NORWAY
SiteTypeVoltageCapacityQueue waitScore
LARRABEE ROADSubstation-Adjacent345 kV600 MW3.9 yrs62.5
HOTEL ROADSubstation-Adjacent115 kV100 MW3.9 yrs56.6
LEWISTON LOWERSubstation-Adjacent115 kV100 MW3.9 yrs56.4
UNKNOWN136746Substation-Adjacent115 kV100 MW3.9 yrs56.4
CROWLEYSSubstation-Adjacent115 kV100 MW3.9 yrs56.3
GULF ISLANDSubstation-Adjacent115 kV100 MW3.9 yrs56.2
UNKNOWN133734Substation-Adjacent115 kV100 MW3.9 yrs56.1
TAP136745Substation-Adjacent115 kV100 MW3.9 yrs55.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.