Skip to content
Gridcensus

EC Near St Francisville Mill

Greenfield

West Feliciana Parish, Louisiana · MISO

DC Readiness
50.4
Fair / 100

EC Near St Francisville Mill is a greenfield datacenter candidate site in West Feliciana Parish, Louisiana, interconnecting through MISO. It screens at 50.4/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_LOUISIANA
Wholesale LMP$32.39/MWh
Utility commercial rate0.13¢/kWh
UtilityENTERGY LOUISIANA LLCinvestor ownedfavorable to large load · terms ≥ 50 MWLarge-load contracts with dedicated generation (Meta Richland Parish) · 15 yr

Speed to power

Interconnection outlookFavorable
≈ 1.4 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth120
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPVenyu BTR1
IXP distance19.2 mi
Fiber providers2
Fiber coverage70.8%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance353.1 mi

Site characteristics

Site typeGreenfield
Land contactWest Feliciana County Assessor
Land owner typeprivate
Buildability0.0/100
Land cover (NLCD)Water
Former usenear retired gas plant (5km)

Risk & environment

Environmental constraintModerate (40/100)
Flood zoneZone A (SFHA)
Water stress (WRI)0.60
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score17/100
Construction cost index97.8 (avg 100)

Location context

Nearest datacenterVenyu BTR1
DC distance19.2 mi
Nearest rail2.6 mi
Nearest gas pipeline0.9 mi
Nearest fiber route134.4 mi
County hazard (FEMA NRI)Very High (58)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.82¢/kWh
Industrial electricity10.84¢/kWh
Cooling degree days2,700
Heating degree days1,700
Land price / acre$3,197

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near St Francisville Mill

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
41
Fiber connectivity12%
76
Energy cost10%
88
Water risk7%
88
Natural hazard6%
17
Buildability7%
0
Labor market4%
50
DC cluster4%
60
Land / acreage3%
48
Construction cost3%
69
Gas pipeline2%
97
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in West Feliciana Parish, ranked by DC Readiness.

Sites near EC Near St Francisville Mill
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN112075Substation-Adjacent500 kV1,000 MW2.8 yrs66.8
FANCY POINTSubstation-Adjacent500 kV1,000 MW2.8 yrs62.6
UNKNOWN112427Substation-Adjacent230 kV300 MW2.8 yrs58.5
TAP173574Substation-Adjacent230 kV300 MW2.8 yrs58.4
UNKNOWN157939Substation-Adjacent230 kV300 MW2.8 yrs58.1
EC Near St Francisville MillGreenfield——1.4 yrs57.8
FRANCISSubstation-Adjacent230 kV300 MW2.8 yrs57.6
EC Near St Francisville MillGreenfield——1.4 yrs56.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC Near St Francisville Mill, West Feliciana Parish is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.