Reserve UST

Industrial

St. John the Baptist, Louisiana · MISO

DC Readiness
48.9
Fair / 100

Reserve UST is an industrial datacenter candidate site in St. John the Baptist, Louisiana, interconnecting through MISO. It screens at 48.9/100 DC Readiness and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth120
Avg queue wait2.8 yrs

Connectivity

Nearest IXPCogent New Orleans
IXP distance26.6 mi
Fiber providers5
Fiber coverage30.2%

Site characteristics

Site typeIndustrial
Land contactSt. John the Baptist County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score42/100

Location context

Nearest datacenterCogent New Orleans
DC distance26.6 mi
County hazard (FEMA NRI)Very High (58)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.81¢/kWh
Industrial electricity10.34¢/kWh
Cooling degree days2,700
Heating degree days1,700
Land price / acre$5,674

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Reserve UST

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
48
Fiber connectivity12%
63
Energy cost10%
50
Water risk7%
88
Natural hazard6%
42
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in St. John the Baptist, ranked by DC Readiness.

Sites near Reserve UST
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN112615Substation-Adjacent230 kV300 MW2.8 yrs59.5
UNKNOWN114129Substation-Adjacent230 kV300 MW2.8 yrs59.4
UNKNOWN112534Substation-Adjacent230 kV300 MW2.8 yrs58.9
UNKNOWN112531Substation-Adjacent230 kV300 MW2.8 yrs57.9
OZ St. John the BaptistGreenfield——1.4 yrs53.7
EC Near Little GypsyGreenfield——1.4 yrs52.7
EC FFE St. John the Baptist ParishGreenfield——1.4 yrs52.0
EC Near Little GypsyGreenfield——1.4 yrs51.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.