OZ St. John the Baptist

Greenfield

St. John the Baptist, Louisiana · MISO

DC Readiness
53.0
Fair / 100

OZ St. John the Baptist is a greenfield datacenter candidate site in St. John the Baptist, Louisiana, interconnecting through MISO. It screens at 53.0/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_LOUISIANA
Wholesale LMP$32.39/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth176
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPCogent New Orleans
IXP distance31.7 mi
Fiber providers6
Fiber coverage28.8%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance413.6 mi

Site characteristics

Site typeGreenfield
Parcel ownerENTERGY LOUISIANA INC
Land owner typeprivate
Buildability50.0/100

Risk & environment

Flood zoneZone AE (SFHA)
Water stress (WRI)0.60
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score17/100
Construction cost index101.4 (avg 100)

Location context

Nearest datacenterCogent New Orleans
DC distance31.7 mi
Nearest rail3.6 mi
Nearest gas pipeline0.9 mi
Nearest fiber route136.0 mi
County hazard (FEMA NRI)Very High (58)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.81¢/kWh
Industrial electricity10.34¢/kWh
Cooling degree days2,700
Heating degree days1,700
Land price / acre$5,674

Incentive detail: Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
54
Fiber connectivity12%
56
Energy cost10%
94
Water risk8%
88
Natural hazard8%
17
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
46
Construction cost3%
66
Gas pipeline2%
97
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in St. John the Baptist, ranked by DC Readiness.

Sites near OZ St. John the Baptist
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN114308Substation-Adjacent230 kV300 MW1.4 yrs69.1
TAP143381Substation-Adjacent230 kV300 MW1.4 yrs68.2
UNKNOWN112534Substation-Adjacent230 kV300 MW1.4 yrs67.4
UNKNOWN112531Substation-Adjacent230 kV300 MW1.4 yrs67.1
UNKNOWN114129Substation-Adjacent230 kV300 MW1.4 yrs66.7
UNKNOWN112532Substation-Adjacent230 kV300 MW1.4 yrs65.1
Greenfield (UNKNOWN112532 - WATERFORD 230K)Greenfield230 kV300 MW1.4 yrs59.9
Greenfield (WILLOW GLEN (500KV) - WATERFOR)Greenfield500 kV1,000 MW1.4 yrs57.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ St. John the Baptist, St. John the Baptist. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.