T.J. Patterson Industrial Park

Shovel-Ready

Hardin County, Kentucky · PJM

DC Readiness
48.7
Fair / 100

T.J. Patterson Industrial Park is a shovel-ready datacenter candidate site in Hardin County, Kentucky, interconnecting through PJM. It screens at 48.7/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth221

Connectivity

Nearest IXPBluegrassNet Louisville
IXP distance40.7 mi

Site characteristics

Site typeShovel-Ready
Acreage27 ac
Former useShovel-ready

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterBluegrassNet Louisville
DC distance40.7 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.80¢/kWh
Industrial electricity6.67¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$5,886

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
50
Fiber connectivity12%
34
Energy cost10%
50
Water risk8%
92
Natural hazard8%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
39
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Hardin County, ranked by DC Readiness.

Sites near T.J. Patterson Industrial Park
SiteTypeVoltageCapacityQueue waitScore
CENTRAL HARDINSubstation-Adjacent138 kV100 MW3.0 yrs63.8
Greenfield (DAVIESS COUNTY - HARDIN)Greenfield345 kV600 MW3.6 yrs62.7
UNKNOWN133788Substation-Adjacent138 kV100 MW3.6 yrs62.7
TAP160469Substation-Adjacent138 kV100 MW3.0 yrs62.2
Greenfield (DAVIESS COUNTY - HARDIN)Greenfield345 kV600 MW3.6 yrs61.9
Greenfield (TAP139012 - HARDIN)Greenfield345 kV600 MW3.0 yrs61.9
UNKNOWN127827Substation-Adjacent138 kV100 MW3.6 yrs61.8
CENTRAL HARDINSubstation-Adjacent138 kV100 MW3.6 yrs61.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for T.J. Patterson Industrial Park, Hardin County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.