Skip to content
Gridcensus

Carabello Coffee

Industrial

Campbell County, Kentucky · PJM

DC Readiness
57.0
Good / 100

At a glance

Carabello Coffee is an industrial datacenter candidate site in Campbell County, Kentucky, scoring 57.0/100 DC Readiness — 14th of 37 scored sites in the county. It sits in the PJM grid region and the DUKE ENERGY KENTUCKY service territory, where interconnection has averaged 4.7 years from request to operation.

Power & interconnection

UtilityDUKE ENERGY KENTUCKYinvestor ownedmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookConstrained
≈ 5.7 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth235
Avg queue wait4.7 yrs
Recent queue wait5.7 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPLevel(3) Cincinnati
IXP distance1.2 mi
Fiber providers3
Fiber coverage95.5%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterLevel(3) Cincinnati
DC distance1.2 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.22¢/kWh
Industrial electricity8.75¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$6,228

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Carabello Coffee

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Carabello Coffee compare with other sites in Campbell County?

Carabello Coffee ranks 14th of 37 scored candidate sites in Campbell County. Its 57.0/100 is roughly in line with the county average of 58.4. It is roughly in line with the Kentucky average of 52.8 and roughly in line with the national average of 53.2.

Against the Kentucky average, its strongest sub-score is fiber connectivity (99 vs 63) and its weakest is power availability (30 vs 33). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Carabello Coffee to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is Level(3) Cincinnati at 1.2 miles. 3 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Level(3) Cincinnati, 1.2 miles away.

What are the flood, water and hazard risks at Carabello Coffee?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). At the county level, FEMA's National Risk Index rates Campbell County "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
47
Fiber connectivity12%
99
Energy cost10%
50
Water risk7%
92
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
100
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Campbell County, ranked by DC Readiness.

Sites near Carabello Coffee
SiteTypeVoltageCapacityQueue waitScore
PIERCESubstation-Adjacent345 kV600 MW5.2 yrs71.2
SILVER GROVESubstation-Adjacent345 kV600 MW4.7 yrs67.7
ZIMMERSubstation-Adjacent345 kV600 MW5.2 yrs64.5
UNKNOWN122450Substation-Adjacent138 kV100 MW4.7 yrs62.1
UNKNOWN137414Substation-Adjacent138 kV100 MW4.7 yrs62.0
CARNTOWNSubstation-Adjacent138 kV100 MW3.9 yrs61.8
UNKNOWN122449Substation-Adjacent138 kV100 MW4.7 yrs61.8
EC Coal Campbell CountyGreenfield——4.7 yrs60.5

Carabello Coffee: common questions

What is the DC Readiness score of Carabello Coffee?

Carabello Coffee scores 57.0/100 on the GridCensus DC Readiness scale, rated good. It ranks 14th of 37 scored sites in Campbell County. The Campbell County average is 58.4 and the Kentucky average is 52.8.

Which electric utility serves Carabello Coffee?

DUKE ENERGY KENTUCKY (investor owned) holds the retail service territory that contains the site; its holding company is DUKE ENERGY CORP.

What grid region is Carabello Coffee in?

Carabello Coffee is in the PJM region. Projects interconnecting there have averaged a 4.7-year wait from queue request to operation.

Is Carabello Coffee in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

How far is Carabello Coffee from an internet exchange?

The nearest internet exchange facility is Level(3) Cincinnati, about 1.2 miles away; 3 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Carabello Coffee, Campbell County, KY”, https://gridcensus.com/datacenter-sites/kentucky/campbell-county/carabello-coffee-031a6bad (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Carabello Coffee, Campbell County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.