Mt. Carmel Redevelopment Site

Industrial

Wyandotte, Kansas · SPP

DC Readiness
48.6
Fair / 100

Mt. Carmel Redevelopment Site is a industrial datacenter candidate site in Wyandotte, Kansas, interconnecting through SPP. It screens at 48.6/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionSPP
Queue depth16

Connectivity

Nearest IXPUnReal Servers
IXP distance3.2 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterUnReal Servers
DC distance3.2 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.42¢/kWh
Industrial electricity9.74¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$9,876

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
52
Fiber connectivity12%
76
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Wyandotte, ranked by DC Readiness.

Sites near Mt. Carmel Redevelopment Site
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN118111Substation-Adjacent161 kV100 MW3.5 yrs72.0
UNKNOWN117108Substation-Adjacent161 kV100 MW3.5 yrs71.4
UNKNOWN149375Substation-Adjacent161 kV100 MW3.5 yrs71.3
UNKNOWN117434Substation-Adjacent161 kV100 MW1.4 yrs71.3
UNKNOWN118073Substation-Adjacent161 kV100 MW3.5 yrs71.2
UNKNOWN117624Substation-Adjacent161 kV100 MW3.5 yrs71.0
UNKNOWN117547Substation-Adjacent161 kV100 MW3.5 yrs70.9
UNKNOWN155810Substation-Adjacent161 kV100 MW3.5 yrs70.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mt. Carmel Redevelopment Site, Wyandotte. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.