Skip to content
Gridcensus

Mine Site

Former Mine

Woodson County, Kansas · SPP

DC Readiness
45.6
Fair / 100

Mine Site is a former mine datacenter candidate site in Woodson County, Kansas, interconnecting through SPP. It screens at 45.6/100 DC Readiness and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest grid bottleneckTP1176_33207 · 75 km (SPP)
UtilityEVERGY KANSAS CENTRAL, INCinvestor ownedfavorable to large load · terms ≥ 75 MWLarge Load Power Service (LLPS, ≥75 MW) · 80% min take · 12 yr

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth64
Avg queue wait3.3 yrs

Connectivity

Nearest IXPDataBank Kansas City (MCI3)
IXP distance81.5 mi
Fiber providers1
Fiber coverage0.2%

Site characteristics

Site typeFormer Mine
Former useMining: Stone; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score65/100

Location context

Nearest datacenterU.S. Bank National Data Process Center
DC distance79.7 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.19¢/kWh
Industrial electricity8.00¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$2,005

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 5 nearby

Get alerts

Track Mine Site

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
54
Fiber connectivity12%
42
Energy cost10%
50
Water risk7%
52
Natural hazard6%
65
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Woodson County, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN168697Substation-Adjacent69 kV50 MW3.3 yrs50.2
UNKNOWN119948Substation-Adjacent69 kV50 MW3.3 yrs50.0
UNKNOWN168700Substation-Adjacent69 kV50 MW3.3 yrs49.8
UNKNOWN119949Substation-Adjacent69 kV50 MW3.3 yrs49.8
UNKNOWN119950Substation-Adjacent69 kV50 MW3.3 yrs49.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mine Site, Woodson County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.