DC Readiness
53.1
Fair / 100

UNKNOWN119802 is a substation-adjacent datacenter candidate site in Ness County, Kansas, interconnecting through SPP. It screens at 53.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN119802
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW

Speed to power

ISO / RTO regionSPP
Queue depth13
Avg queue wait3.3 yrs

Connectivity

Nearest IXPBeloit-NOC
IXP distance126.9 mi
Fiber providers3
Fiber coverage100.0%

Site characteristics

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score65/100

Location context

Nearest datacenterCloud Storage Corp
DC distance51.3 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity9.84¢/kWh
Industrial electricity10.95¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$1,424

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 4 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
53
Fiber connectivity12%
45
Energy cost10%
50
Water risk8%
52
Natural hazard8%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
55

Nearby comparable sites

Other scored datacenter candidate sites in Ness County, ranked by DC Readiness.

Sites near UNKNOWN119802
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN119804Substation-Adjacent115 kV100 MW3.3 yrs53.1
UNKNOWN119801Substation-Adjacent115 kV100 MW3.3 yrs53.1
Greenfield (UNKNOWN119803 - TAP138843)Greenfield115 kV100 MW3.3 yrs46.8
Greenfield (UNKNOWN119801 - UNKNOWN173415)Greenfield115 kV100 MW3.3 yrs46.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.