Skip to content
Gridcensus

Cornerstone Fellowship Church

Industrial

Linn County, Kansas · SPP

DC Readiness
48.9
Fair / 100

Cornerstone Fellowship Church is an industrial datacenter candidate site in Linn County, Kansas, interconnecting through SPP. It screens at 48.9/100 DC Readiness and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest grid bottleneckTMP338_28287 · 73 km (SPP)
UtilityEVERGY KANSAS CENTRAL, INCinvestor ownedfavorable to large load · terms ≥ 75 MWLarge Load Power Service (LLPS, ≥75 MW) · 80% min take · 12 yr

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth64
Avg queue wait3.3 yrs

Connectivity

Nearest IXPQTS Overland Park (OVP1)
IXP distance52.9 mi
Fiber providers4
Fiber coverage65.8%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterQTS Overland Park (OVP1)
DC distance52.9 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity10.80¢/kWh
Industrial electricity9.52¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$3,041

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Cornerstone Fellowship Church

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
54
Fiber connectivity12%
64
Energy cost10%
50
Water risk7%
52
Natural hazard6%
65
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Linn County, ranked by DC Readiness.

Sites near Cornerstone Fellowship Church
SiteTypeVoltageCapacityQueue waitScore
LA CYGNESubstation-Adjacent345 kV600 MW3.3 yrs61.7
EC Coal Linn CountyGreenfield——3.5 yrs59.4
EC Coal Linn CountyGreenfield——3.5 yrs57.1
UNKNOWN118030Substation-Adjacent161 kV100 MW3.3 yrs56.1
EC Coal Linn CountyGreenfield——3.5 yrs55.3
Mine SiteFormer Mine——3.3 yrs49.3
Mine SiteFormer Mine——3.3 yrs49.2
Mine SiteFormer Mine——3.3 yrs49.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Cornerstone Fellowship Church, Linn County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.