Ellis Community Center BTA
IndustrialEllis, Kansas · SPP
At a glance
Ellis Community Center BTA is an industrial datacenter candidate site in Ellis, Kansas, scoring 52.0/100 DC Readiness — 25th of 31 scored sites in the county. It sits in the SPP grid region and the MIDWEST ENERGY INC service territory, where interconnection has averaged 4.3 years from request to operation.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.
Site location
Get alerts
Track Ellis Community Center BTA
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Ellis Community Center BTA compare with other sites in Ellis?
Ellis Community Center BTA ranks 25th of 31 scored candidate sites in Ellis. Its 52.0/100 is roughly in line with the county average of 56.3. It is roughly in line with the Kansas average of 53.2 and roughly in line with the national average of 53.2.
Against the Kansas average, its strongest sub-score is fiber connectivity (75 vs 71) and its weakest is power availability (30 vs 38). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Ellis Community Center BTA to power, fiber and other datacenters?
The nearest located transmission bottleneck is CIMXF2CIMXF3 (SPP), 85 miles away. For connectivity, the nearest internet exchange facility is Beloit-NOC at 85.5 miles. 5 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Cloud Storage Corp, 14.7 miles away.
What are the flood, water and hazard risks at Ellis Community Center BTA?
At the county level, FEMA's National Risk Index rates Ellis "Relatively High".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Ellis, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN119892 | Substation-Adjacent | 345 kV | 600 MW | 4.3 yrs | 63.9 |
| UNKNOWN118146 | Substation-Adjacent | 230 kV | 300 MW | 4.3 yrs | 62.9 |
| UNKNOWN149329 | Substation-Adjacent | 230 kV | 300 MW | 4.3 yrs | 61.7 |
| EC Near Ellis | Greenfield | — | — | 4.3 yrs | 60.7 |
| EC Near Ellis | Greenfield | — | — | 4.3 yrs | 60.6 |
| EC Near Ellis | Greenfield | — | — | 4.3 yrs | 60.6 |
| EC Near Ellis | Greenfield | — | — | 4.3 yrs | 60.3 |
| EC Near Ellis | Greenfield | — | — | 4.3 yrs | 59.8 |
Ellis Community Center BTA: common questions
What is the DC Readiness score of Ellis Community Center BTA?
Ellis Community Center BTA scores 52.0/100 on the GridCensus DC Readiness scale, rated fair. It ranks 25th of 31 scored sites in Ellis. The Ellis average is 56.3 and the Kansas average is 53.2.
Which electric utility serves Ellis Community Center BTA?
MIDWEST ENERGY INC (cooperative) holds the retail service territory that contains the site.
What grid region is Ellis Community Center BTA in?
Ellis Community Center BTA is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.
How far is Ellis Community Center BTA from an internet exchange?
The nearest internet exchange facility is Beloit-NOC, about 85.5 miles away; 5 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Ellis Community Center BTA, Ellis, KS”, https://gridcensus.com/datacenter-sites/kansas/ellis/ellis-community-center-bta-6b16b7a8 (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Ellis Community Center BTA, Ellis is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.