UNKNOWN173214

Substation-Adjacent

Doniphan County, Kansas · SPP

DC Readiness
54.1
Fair / 100

UNKNOWN173214 is a substation-adjacent datacenter candidate site in Doniphan County, Kansas, interconnecting through SPP. It screens at 54.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN173214
Nearest grid bottleneckTMP918_33023 · 69 km (SPP)
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityEVERGY KANSAS CENTRAL, INCinvestor ownedfavorable to large load · terms ≥ 75 MWLarge Load Power Service (LLPS, ≥75 MW) · 80% min take · 12 yr

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth64
Avg queue wait3.3 yrs

Connectivity

Nearest IXPLincoln Rackhouse Kansas City
IXP distance38.2 mi
Fiber providers2
Fiber coverage55.4%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterDatacenter 00195169261
DC distance37.5 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.02¢/kWh
Industrial electricity9.10¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$4,754

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 4 nearby

Get alerts

Track UNKNOWN173214

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
54
Fiber connectivity12%
57
Energy cost10%
50
Water risk7%
52
Natural hazard6%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Doniphan County, ranked by DC Readiness.

Sites near UNKNOWN173214
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN120003Substation-Adjacent69 kV50 MW3.3 yrs52.6
801 Woodsdale Road BTAIndustrial——3.3 yrs49.0
Mine SiteFormer Mine——3.3 yrs48.8
Mine SiteFormer Mine——3.3 yrs48.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.