City of Aurora is an industrial datacenter candidate site in Cloud County, Kansas, interconnecting through SPP. It screens at 48.6/100 DC Readiness and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest grid bottleneckSMKSUMPOSAXT · 81 km (SPP)
UtilityPRAIRIE LAND ELECTRIC COOP INCcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth59
Avg queue wait3.3 yrs

Connectivity

Nearest IXPBeloit-NOC
IXP distance30.9 mi
Fiber providers3
Fiber coverage93.2%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterBeloit-NOC
DC distance30.9 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity13.03¢/kWh
Industrial electricity7.87¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$3,142

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track City of Aurora

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
33
Fiber connectivity12%
75
Energy cost10%
50
Water risk7%
52
Natural hazard6%
65
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Cloud County, ranked by DC Readiness.

Sites near City of Aurora
SiteTypeVoltageCapacityQueue waitScore
OZ CloudGreenfield——3.5 yrs60.9
ELM CREEKSubstation-Adjacent345 kV600 MW3.3 yrs60.7
UNKNOWN118209Substation-Adjacent230 kV300 MW3.3 yrs59.6
UNKNOWN117980Substation-Adjacent230 kV300 MW3.3 yrs59.3
UNKNOWN118212Substation-Adjacent230 kV300 MW3.3 yrs58.9
Greenfield (UNKNOWN118208 - UNKNOWN118209)Greenfield115 kV100 MW3.3 yrs50.8
Walthers Oil Co. BTA PropertyIndustrial——3.3 yrs49.8
811 WashingtonIndustrial——3.3 yrs49.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for City of Aurora, Cloud County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.