Butler County, Kansas · SPP

DC Readiness
49.5
Fair / 100

TAP148753 is a substation-adjacent datacenter candidate site in Butler County, Kansas, interconnecting through SPP. It screens at 49.5/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP148753
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

ISO / RTO regionSPP
Queue depth13
Avg queue wait3.3 yrs

Connectivity

Nearest IXPOneNet OSU Tulsa
IXP distance124.8 mi
Fiber providers8
Fiber coverage72.4%

Site characteristics

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score65/100

Location context

Nearest datacenterSC DC
DC distance97.6 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.21¢/kWh
Industrial electricity7.88¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$2,796

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power15%
53
Fiber connectivity12%
38
Energy cost10%
50
Water risk8%
52
Natural hazard8%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
55

Nearby comparable sites

Other scored datacenter candidate sites in Butler County, ranked by DC Readiness.

Sites near TAP148753
SiteTypeVoltageCapacityQueue waitScore
OZ ButlerGreenfield3.5 yrs59.2
ROSE HILLSubstation-Adjacent345 kV600 MW3.3 yrs57.7
UNKNOWN118020Substation-Adjacent138 kV100 MW3.3 yrs51.8
UNKNOWN118019Substation-Adjacent138 kV100 MW3.3 yrs51.8
UNKNOWN118021Substation-Adjacent138 kV100 MW3.3 yrs51.8
UNKNOWN118990Substation-Adjacent138 kV100 MW3.3 yrs51.8
Greenfield (UNKNOWN118254 - ROSE HILL)Greenfield345 kV600 MW3.3 yrs51.4
UNKNOWN159504Substation-Adjacent69 kV50 MW3.3 yrs49.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP148753, Butler County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.