Bourbon County, Kansas · SPP

DC Readiness
49.1
Fair / 100

TAP168714 is a substation-adjacent datacenter candidate site in Bourbon County, Kansas, interconnecting through SPP. It screens at 49.1/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP168714
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

ISO / RTO regionSPP
Queue depth13
Avg queue wait3.3 yrs

Connectivity

Nearest IXPQTS Overland Park (OVP1)
IXP distance74.1 mi
Fiber providers1
Fiber coverage73.5%

Site characteristics

Risk & environment

Flood zoneZone X
Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score65/100

Location context

Nearest datacenterQTS Overland Park (OVP1)
DC distance74.1 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.05¢/kWh
Industrial electricity8.46¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$2,844

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power15%
53
Fiber connectivity12%
35
Energy cost10%
50
Water risk8%
52
Natural hazard8%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
55

Nearby comparable sites

Other scored datacenter candidate sites in Bourbon County, ranked by DC Readiness.

Sites near TAP168714
SiteTypeVoltageCapacityQueue waitScore
EC Coal Bourbon CountyGreenfield3.5 yrs58.3
EC Coal Bourbon CountyGreenfield3.5 yrs57.5
EC Coal Bourbon CountyGreenfield3.5 yrs56.1
EC Coal Bourbon CountyGreenfield3.5 yrs55.9
UNKNOWN157372Substation-Adjacent69 kV50 MW3.3 yrs49.1
UNKNOWN168708Substation-Adjacent69 kV50 MW3.3 yrs49.1
Darling Appliance RepairIndustrial3.3 yrs49.1
UNKNOWN168715Substation-Adjacent69 kV50 MW3.3 yrs49.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.