UNKNOWN119977

Substation-Adjacent

Barton County, Kansas · SPP

DC Readiness
54.0
Fair / 100

UNKNOWN119977 is a substation-adjacent datacenter candidate site in Barton County, Kansas, interconnecting through SPP. It screens at 54.0/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN119977
Nearest grid bottleneckSMKSUMPOSAXT · 102 km (SPP)
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityMIDWEST ENERGY INCcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth59
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPBeloit-NOC
IXP distance78.9 mi
Fiber providers9
Fiber coverage83.4%

Site characteristics

Land contactBarton County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterCloud Storage Corp
DC distance49.3 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity10.12¢/kWh
Industrial electricity10.30¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$1,821

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN119977

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
55
Fiber connectivity12%
72
Energy cost10%
50
Water risk7%
52
Natural hazard6%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Barton County, ranked by DC Readiness.

Sites near UNKNOWN119977
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN118036Substation-Adjacent230 kV300 MW4.3 yrs60.3
EC Near HoisingtonGreenfield——4.3 yrs58.8
EC Near Great Bend - Midwest EnergyGreenfield——4.3 yrs58.6
EC Near HoisingtonGreenfield——4.3 yrs58.5
EC Near Great Bend - Midwest EnergyGreenfield——4.3 yrs58.4
EC Near Great Bend - Midwest EnergyGreenfield——4.3 yrs58.4
EC Near HoisingtonGreenfield——4.3 yrs58.3
EC Near Great Bend - Midwest EnergyGreenfield——4.3 yrs57.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UNKNOWN119977, Barton County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.