Skip to content
Gridcensus

Former Mine site at 38.307, -98.878

Former Mine

Barton County, Kansas · SPP

DC Readiness
48.9
Fair / 100

At a glance

Former Mine site at 38.307, -98.878 is a former mine datacenter candidate site in Barton County, Kansas, scoring 48.9/100 DC Readiness — 57th of 57 scored sites in the county. It sits in the SPP grid region and the MIDWEST ENERGY INC service territory, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

Nearest grid bottleneckSMKSUMPOSAXT · 125 km (SPP)
UtilityMIDWEST ENERGY INCcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth59
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPBeloit-NOC
IXP distance89.7 mi
Fiber providers9
Fiber coverage83.4%

Site characteristics

Site typeFormer Mine
Former useMining: SandAndGravel; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Environmental constraintLow (25/100)
Flood zoneZone AE (SFHA)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score50/100

Location context

Nearest datacenterCloud Storage Corp
DC distance45.2 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity10.12¢/kWh
Industrial electricity10.30¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$1,821

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Mine Site

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Former Mine site at 38.307, -98.878 compare with other sites in Barton County?

Former Mine site at 38.307, -98.878 ranks 57th of 57 scored candidate sites in Barton County. Its 48.9/100 is roughly in line with the county average of 54.3. It is roughly in line with the Kansas average of 53.2 and roughly in line with the national average of 53.2.

Against the Kansas average, its strongest sub-score is speed to power (55 vs 55) and its weakest is natural hazard (50 vs 64). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Former Mine site at 38.307, -98.878 to power, fiber and other datacenters?

The nearest located transmission bottleneck is SMKSUMPOSAXT (SPP), 78 miles away. For connectivity, the nearest internet exchange facility is Beloit-NOC at 89.7 miles. 9 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Cloud Storage Corp, 45.2 miles away.

What are the flood, water and hazard risks at Former Mine site at 38.307, -98.878?

The site is in FEMA flood zone AE, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding. At the county level, FEMA's National Risk Index rates Barton County "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
55
Fiber connectivity12%
70
Energy cost10%
50
Water risk7%
52
Natural hazard6%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Barton County, ranked by DC Readiness.

Sites near Former Mine site at 38.307, -98.878
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN118036Substation-Adjacent230 kV300 MW4.3 yrs60.3
EC Near HoisingtonGreenfield——4.3 yrs58.8
EC Near Great Bend - Midwest EnergyGreenfield——4.3 yrs58.6
EC Near HoisingtonGreenfield——4.3 yrs58.5
EC Near Great Bend - Midwest EnergyGreenfield——4.3 yrs58.4
EC Near Great Bend - Midwest EnergyGreenfield——4.3 yrs58.4
EC Near HoisingtonGreenfield——4.3 yrs58.3
EC Near Great Bend - Midwest EnergyGreenfield——4.3 yrs57.9

Former Mine site at 38.307, -98.878: common questions

What is the DC Readiness score of Former Mine site at 38.307, -98.878?

Former Mine site at 38.307, -98.878 scores 48.9/100 on the GridCensus DC Readiness scale, rated fair. It ranks 57th of 57 scored sites in Barton County. The Barton County average is 54.3 and the Kansas average is 53.2.

Which electric utility serves Former Mine site at 38.307, -98.878?

MIDWEST ENERGY INC (cooperative) holds the retail service territory that contains the site.

What grid region is Former Mine site at 38.307, -98.878 in?

Former Mine site at 38.307, -98.878 is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

Is Former Mine site at 38.307, -98.878 in a flood zone?

The site is in FEMA flood zone AE, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding.

How far is Former Mine site at 38.307, -98.878 from an internet exchange?

The nearest internet exchange facility is Beloit-NOC, about 89.7 miles away; 9 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Former Mine site at 38.307, -98.878, Barton County, KS”, https://gridcensus.com/datacenter-sites/kansas/barton-county/mine-site-08dcddfc (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Former Mine site at 38.307, -98.878, Barton County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.