Garnett Astrocap BTA

Industrial

Anderson County, Kansas · SPP

DC Readiness
49.2
Fair / 100

Garnett Astrocap BTA is an industrial datacenter candidate site in Anderson County, Kansas, interconnecting through SPP. It screens at 49.2/100 DC Readiness and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest grid bottleneckTMP338_28287 · 75 km (SPP)
UtilityEVERGY KANSAS CENTRAL, INCinvestor ownedfavorable to large load · terms ≥ 75 MWLarge Load Power Service (LLPS, ≥75 MW) · 80% min take · 12 yr

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth64
Avg queue wait3.3 yrs

Connectivity

Nearest IXPDataBank Kansas City (MCI3)
IXP distance50.8 mi
Fiber providers4
Fiber coverage60.1%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterU.S. Bank National Data Process Center
DC distance49.2 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity10.95¢/kWh
Industrial electricity8.89¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$2,736

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Garnett Astrocap BTA

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
54
Fiber connectivity12%
66
Energy cost10%
50
Water risk7%
52
Natural hazard6%
65
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Anderson County, ranked by DC Readiness.

Sites near Garnett Astrocap BTA
SiteTypeVoltageCapacityQueue waitScore
EC Coal Anderson CountyGreenfield——3.5 yrs60.1
OZ AndersonGreenfield——3.5 yrs56.9
Garnett Church BTAIndustrial——3.3 yrs49.3
Garnett Astrotruck Cover BTAIndustrial——3.3 yrs49.3
Anderson BuildingIndustrial——3.3 yrs49.3
Garnett Armory BTAIndustrial——3.3 yrs49.3
Chamber Ps TheatreIndustrial——3.3 yrs49.3
Colony BTAIndustrial——3.3 yrs47.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen