Former Atlas "f" Missile Site #3

Industrial

Mills County, Iowa · SPP

DC Readiness
56.0
Good / 100

Former Atlas "f" Missile Site #3 is an industrial datacenter candidate site in Mills County, Iowa, interconnecting through SPP. It screens at 56.0/100 DC Readiness and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

UtilityMIDAMERICAN ENERGY COinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth4
Avg queue wait3.3 yrs

Connectivity

Nearest IXPTierPoint Omaha - Bellevue
IXP distance18.7 mi
Fiber providers8
Fiber coverage96.5%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterGoogle
DC distance15.8 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.43¢/kWh
Industrial electricity6.05¢/kWh
Cooling degree days900
Heating degree days6,500
Land price / acre$8,944

Regulatory climate

Favorablestate posture · as of 2026-08

Strong incentives; utilities courting hyperscale load.

DC tax incentiveYes

Incentive detail: Sales tax exemption on DC equipment for $1M+ investments; property tax phase-in for new construction.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Former Atlas "f" Missile Site #3

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
61
Fiber connectivity12%
83
Energy cost10%
50
Water risk7%
88
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
39
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
80

Nearby comparable sites

Other scored datacenter candidate sites in Mills County, ranked by DC Readiness.

Sites near Former Atlas "f" Missile Site #3
SiteTypeVoltageCapacityQueue waitScore
WALTER SCOTT ENERGY CENTERSubstation-Adjacent345 kV600 MW2.8 yrs69.9
UNKNOWN131416Substation-Adjacent345 kV600 MW2.8 yrs68.4
UNKNOWN137755Substation-Adjacent345 kV600 MW2.8 yrs68.4
EC Coal Mills CountyGreenfield——1.4 yrs63.9
EC Coal Mills CountyGreenfield——1.4 yrs63.8
UNKNOWN131499Substation-Adjacent161 kV100 MW2.8 yrs63.0
UNKNOWN131421Substation-Adjacent161 kV100 MW2.8 yrs59.3
UNKNOWN167607Substation-Adjacent69 kV50 MW2.8 yrs58.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.