At a glance

EC Near Caterpillar is a greenfield datacenter candidate site in TIPPECANOE, Indiana, scoring 57.3/100 DC Readiness — 25th of 135 scored sites in the county. It sits in the MISO grid region and the DUKE ENERGY INDIANA, LLC service territory, where interconnection has averaged 3.0 years from request to operation.

Power & interconnection

Nearest grid bottleneckSIDOGASIDKEY · 114 km (MISO)
LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.11¢/kWh
UtilityDUKE ENERGY INDIANA, LLCinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth170
Avg queue wait3.0 yrs
Recent queue wait4.9 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPWintek Corporation
IXP distance3.7 mi
Fiber providers13
Fiber coverage94.8%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance106.0 mi

Site characteristics

Site typeGreenfield
Land contactTippecanoe County Assessor
Land owner typeprivate
Buildability90.0/100
Land cover (NLCD)Developed, Open Space
Former usenear retired oil plant (5km)

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteMILESTONE CONTRACTORS L P 22
Hazard sub-score58/100
Construction cost index94.6 (avg 100)

Location context

Nearest datacenterWintek Corporation
DC distance3.7 mi
Nearest rail0.7 mi
Nearest gas pipeline29.9 mi
Nearest fiber route54.9 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.36¢/kWh
Industrial electricity8.27¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$8,601

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Caterpillar

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does EC Near Caterpillar compare with other sites in TIPPECANOE?

EC Near Caterpillar ranks 25th of 135 scored candidate sites in TIPPECANOE. Its 57.3/100 is roughly in line with the county average of 57.7. It is roughly in line with the Indiana average of 54.0 and roughly in line with the national average of 53.2.

Against the Indiana average, its strongest sub-score is speed to power (47 vs 46) and its weakest is fiber connectivity (52 vs 79). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is EC Near Caterpillar to power, fiber and other datacenters?

The nearest located transmission bottleneck is SIDOGASIDKEY (MISO), 71 miles away. For connectivity, the nearest internet exchange facility is Wintek Corporation at 3.7 miles. 13 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Wintek Corporation, 3.7 miles away.

What are the flood, water and hazard risks at EC Near Caterpillar?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). WRI rates baseline water stress at 0.50 on a 0–5 scale. No mapped wetlands are recorded on the parcel. A Superfund site is nearby (MILESTONE CONTRACTORS L P 22). At the county level, FEMA's National Risk Index rates TIPPECANOE "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
47
Fiber connectivity12%
52
Energy cost10%
89
Water risk7%
91
Natural hazard6%
58
Buildability7%
90
Labor market4%
50
DC cluster4%
85
Land / acreage3%
42
Construction cost3%
71
Gas pipeline2%
4
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in TIPPECANOE, ranked by DC Readiness.

Sites near EC Near Caterpillar
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN123368Substation-Adjacent345 kV600 MW3.0 yrs67.7
DEQUINESubstation-Adjacent345 kV600 MW3.0 yrs67.6
LAFAYETTE 230Substation-Adjacent230 kV300 MW3.0 yrs67.1
OZ TippecanoeGreenfield——3.0 yrs64.5
OZ TippecanoeGreenfield——3.0 yrs64.2
EC Near CaterpillarGreenfield——3.0 yrs63.9
LAFAYETTE CATEPILLARSubstation-Adjacent138 kV100 MW3.0 yrs63.5
TAP138289Substation-Adjacent138 kV100 MW3.0 yrs63.1

EC Near Caterpillar: common questions

What is the DC Readiness score of EC Near Caterpillar?

EC Near Caterpillar scores 57.3/100 on the GridCensus DC Readiness scale, rated good. It ranks 25th of 135 scored sites in TIPPECANOE. The TIPPECANOE average is 57.7 and the Indiana average is 54.0.

Which electric utility serves EC Near Caterpillar?

DUKE ENERGY INDIANA, LLC (investor owned) holds the retail service territory that contains the site; its holding company is DUKE ENERGY CORP.

What grid region is EC Near Caterpillar in?

EC Near Caterpillar is in the MISO region. Projects interconnecting there have averaged a 3.0-year wait from queue request to operation.

Is EC Near Caterpillar in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

Who owns EC Near Caterpillar?

Parcel records list the owner as DUKE ENERGY INDIANA INC (private land).

How far is EC Near Caterpillar from an internet exchange?

The nearest internet exchange facility is Wintek Corporation, about 3.7 miles away; 13 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EC Near Caterpillar, TIPPECANOE, IN”, https://gridcensus.com/datacenter-sites/indiana/tippecanoe/ec-near-caterpillar-5ac4af97 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC Near Caterpillar, TIPPECANOE is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.