MORRISON
Substation-AdjacentNewton, Indiana · PJM
MORRISON is a substation-adjacent datacenter candidate site in Newton, Indiana, interconnecting through PJM. It screens at 55.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
Site location
Get alerts
Track MORRISON
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Newton, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| OZ Newton | Greenfield | — | — | 3.0 yrs | 57.6 |
| PARKER HANNIFIN CORP. (FLUID POWER CYLINDER AND ACTUATOR MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 52.7 |
| ADKEV, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 52.7 |
| 3 D MACHINE, INC. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 52.7 |
| CPX S & S PLASTICS, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 51.9 |
| ROGERS GROUP, INC. (CUT STONE AND STONE PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 51.9 |
| COILS, INC. (OTHER ELECTRONIC COMPONENT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 51.9 |
| BON L MFG. (OTHER ALUMINUM ROLLING AND DRAWING) | Manufacturing | — | — | 3.5 yrs | 51.9 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.