Skip to content
Gridcensus

Datacenter Sites in Newton, Indiana

Newton has 15 scored datacenter candidate sites averaging 52.0/100 DC Readiness, with a catalogued aggregate of 100 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

15
Candidate sites
52.0/100
Avg DC Readiness
100 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 15 in Newton

Site-selection context for Newton

Yessales_tax_exemption
Datacenter tax incentive
15.56¢/kWh
Commercial electricity
6.61¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$8,765
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in Newton

Top datacenter sites in Newton
SiteTypeVoltageCapacityQueue waitScore
OZ NewtonGreenfield——3.0 yrs57.6
MORRISONSubstation-Adjacent138 kV100 MW3.8 yrs55.5
PARKER HANNIFIN CORP. (FLUID POWER CYLINDER AND ACTUATOR MANUFACTURING)Manufacturing——3.5 yrs52.7
ADKEV, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing——3.5 yrs52.7
3 D MACHINE, INC. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING)Manufacturing——3.5 yrs52.7
COILS, INC. (OTHER ELECTRONIC COMPONENT MANUFACTURING)Manufacturing——3.5 yrs51.9
ROGERS GROUP, INC. (CUT STONE AND STONE PRODUCT MANUFACTURING)Manufacturing——3.5 yrs51.9
CPX S & S PLASTICS, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing——3.5 yrs51.9
BON L MFG. (OTHER ALUMINUM ROLLING AND DRAWING)Manufacturing——3.5 yrs51.9
USEFUL PRODUCTS, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing——3.5 yrs51.9
WHEELOCK MFG., INC. (NOT AVAILABLE)Manufacturing——3.5 yrs51.8
EC FFE Newton CountyGreenfield——3.0 yrs50.7
Former Mr. Heat PropertyIndustrial——3.8 yrs49.2
Former Sellers Gas Station and Pullman DinerIndustrial——3.8 yrs49.1
Newton County Council on AgingIndustrial——3.8 yrs49.1

Newton datacenter FAQ

How many datacenter sites are in Newton?
15 scored datacenter candidate sites, averaging 52.0/100 DC Readiness.
Does Newton offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in Newton?
FEMA's National Risk Index rates Newton as "Relatively Moderate" (score 32).
What are industrial electricity rates in Newton?
Average industrial electricity is 6.61¢/kWh and commercial is 15.56¢/kWh in Newton.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Newton, Indiana. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.