Skip to content
Gridcensus

EC Coal Lake County

Greenfield

Lake County, Indiana · PJM

DC Readiness
53.1
Fair / 100

At a glance

EC Coal Lake County is a greenfield datacenter candidate site in Lake County, Indiana, scoring 53.1/100 DC Readiness — 198th of 419 scored sites in the county. It sits in the PJM grid region, where interconnection has averaged 3.0 years from request to operation.

Power & interconnection

LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.17¢/kWh

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth406
Avg queue wait3.0 yrs
Recent queue wait4.9 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPCDC1 - 350 E Cermak Rd
IXP distance17.2 mi
Fiber providers9
Fiber coverage39.6%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance18.8 mi

Site characteristics

Site typeGreenfield
Land contactLake County County Assessor
Land owner typeprivate
Buildability5.0/100
Land cover (NLCD)Water
Former usecoal adjacent

Risk & environment

Environmental constraintLow (15/100)
Flood zoneZone OPEN WATER
Water stress (WRI)0.50
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score58/100
Construction cost index107.6 (avg 100)

Location context

Nearest datacenterDigital Crossroad
DC distance8.8 mi
Nearest rail4.1 mi
Nearest gas pipeline8.4 mi
Nearest fiber route24.4 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity16.78¢/kWh
Industrial electricity6.44¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$7,916

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Coal Lake County

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does EC Coal Lake County compare with other sites in Lake County?

EC Coal Lake County ranks 198th of 419 scored candidate sites in Lake County. Its 53.1/100 is roughly in line with the county average of 53.8. It is roughly in line with the Indiana average of 54.0 and roughly in line with the national average of 53.2.

Against the Indiana average, its strongest sub-score is power availability (30 vs 33) and its weakest is natural hazard (58 vs 68). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is EC Coal Lake County to power, fiber and other datacenters?

The nearest located transmission bottleneck is AEPCE01_ROXANA_13835_A (MISO), 9 miles away. For connectivity, the nearest internet exchange facility is CDC1 - 350 E Cermak Rd at 17.2 miles. 9 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Digital Crossroad, 8.8 miles away.

What are the flood, water and hazard risks at EC Coal Lake County?

The site is in FEMA flood zone OPEN WATER. WRI rates baseline water stress at 0.50 on a 0–5 scale. Mapped wetlands (National Wetlands Inventory) are present on the parcel. At the county level, FEMA's National Risk Index rates Lake County "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
42
Fiber connectivity12%
70
Energy cost10%
84
Water risk7%
86
Natural hazard6%
58
Buildability7%
5
Labor market4%
50
DC cluster4%
95
Land / acreage3%
42
Construction cost3%
60
Gas pipeline2%
73
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Lake County, ranked by DC Readiness.

Sites near EC Coal Lake County
SiteTypeVoltageCapacityQueue waitScore
BURNHAMSubstation-Adjacent345 kV600 MW4.8 yrs65.7
LANSINGSubstation-Adjacent345 kV600 MW4.8 yrs65.6
SHEFFIELDSubstation-Adjacent345 kV600 MW3.0 yrs65.6
UNKNOWN122523Substation-Adjacent345 kV600 MW3.0 yrs65.6
TAP138162Substation-Adjacent345 kV600 MW4.8 yrs65.5
MUNSTERSubstation-Adjacent345 kV600 MW3.0 yrs65.4
UNKNOWN121993Substation-Adjacent345 kV600 MW4.8 yrs65.4
UNKNOWN122521Substation-Adjacent345 kV600 MW3.0 yrs65.2

EC Coal Lake County: common questions

What is the DC Readiness score of EC Coal Lake County?

EC Coal Lake County scores 53.1/100 on the GridCensus DC Readiness scale, rated fair. It ranks 198th of 419 scored sites in Lake County. The Lake County average is 53.8 and the Indiana average is 54.0.

What grid region is EC Coal Lake County in?

EC Coal Lake County is in the PJM region. Projects interconnecting there have averaged a 3.0-year wait from queue request to operation.

Is EC Coal Lake County in a flood zone?

The site is in FEMA flood zone OPEN WATER.

Who owns EC Coal Lake County?

Parcel records list the owner as NORTHERN INDIANA PUB SERV CO (private land).

How far is EC Coal Lake County from an internet exchange?

The nearest internet exchange facility is CDC1 - 350 E Cermak Rd, about 17.2 miles away; 9 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EC Coal Lake County, Lake County, IN”, https://gridcensus.com/datacenter-sites/indiana/lake-county/ec-coal-lake-county-5524d0cc (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC Coal Lake County, Lake County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.