Skip to content
Gridcensus

EC Coal Greene County

Greenfield

Greene County, Indiana · PJM

DC Readiness
56.5
Good / 100

EC Coal Greene County is a greenfield datacenter candidate site in Greene County, Indiana, interconnecting through PJM. It screens at 56.5/100 DC Readiness and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.13¢/kWh
UtilityDUKE ENERGY INDIANA, LLCinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 4.2 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth62
Avg queue wait3.0 yrs
Recent queue wait4.2 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPIndiana University Data Center
IXP distance22.9 mi
Fiber providers6
Fiber coverage16.1%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance195.0 mi

Site characteristics

Site typeGreenfield
Land contactGreene County County Assessor
Land owner typeprivate
Buildability90.0/100
Land cover (NLCD)Developed, Open Space
Former usecoal adjacent

Risk & environment

Environmental constraintLow (25/100)
Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatPresent
Superfund nearbyClear
Hazard sub-score48/100
Construction cost index63.8 (avg 100)

Location context

Nearest datacenterIU Data Center
DC distance22.9 mi
Nearest rail2.4 mi
Nearest gas pipeline6.4 mi
Nearest fiber route72.7 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.63¢/kWh
Industrial electricity9.17¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$5,946

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Coal Greene County

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
39
Fiber connectivity12%
60
Energy cost10%
83
Water risk7%
87
Natural hazard6%
48
Buildability7%
90
Labor market4%
50
DC cluster4%
60
Land / acreage3%
42
Construction cost3%
97
Gas pipeline2%
79
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Greene County, ranked by DC Readiness.

Sites near EC Coal Greene County
SiteTypeVoltageCapacityQueue waitScore
WORTHINGTON PRIMARY SUBSTATIONSubstation-Adjacent345 kV600 MW3.8 yrs60.6
EC Coal Greene CountyGreenfield——3.0 yrs57.2
EC Coal Greene CountyGreenfield——3.0 yrs55.9
EC Coal Greene CountyGreenfield——3.0 yrs55.9
TAP138328Substation-Adjacent138 kV100 MW3.8 yrs54.8
Greenfield (PETERSBURG STATION - RISER1671)Greenfield345 kV600 MW3.8 yrs54.5
TAP158583Substation-Adjacent138 kV100 MW3.8 yrs54.3
UNKNOWN158584Substation-Adjacent138 kV100 MW3.8 yrs53.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Coal Greene County, Greene County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.