Former Finest Finishes
IndustrialFULTON, Indiana · MISO
At a glance
Former Finest Finishes is an industrial datacenter candidate site in FULTON, Indiana, scoring 51.6/100 DC Readiness — 2nd of 57 scored sites in the county. It sits in the MISO grid region and the DUKE ENERGY INDIANA, LLC service territory, where interconnection has averaged 3.0 years from request to operation.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
Site location
Get alerts
Track Former Finest Finishes
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Former Finest Finishes compare with other sites in FULTON?
Former Finest Finishes ranks 2nd of 57 scored candidate sites in FULTON. Its 51.6/100 is roughly in line with the county average of 51.5. It is roughly in line with the Indiana average of 54.0 and roughly in line with the national average of 53.2.
Against the Indiana average, its strongest sub-score is speed to power (47 vs 46) and its weakest is fiber connectivity (75 vs 79). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Former Finest Finishes to power, fiber and other datacenters?
The nearest located transmission bottleneck is Crete_St_Johns_Tap_345_kV_l_o_Dum_Wi_Cent_765_kV (MISO), 67 miles away. For connectivity, the nearest internet exchange facility is Aunalytics South Bend Datacenter (AUSB) at 41.1 miles. 6 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Aunalytics South Bend Datacenter (AUSB), 41.1 miles away.
What are the flood, water and hazard risks at Former Finest Finishes?
At the county level, FEMA's National Risk Index rates FULTON "Relatively Moderate".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in FULTON, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN122874 | Substation-Adjacent | 345 kV | 600 MW | 3.0 yrs | 63.1 |
| ROCHESTER HOMES, INC. (MANUFACTURED HOME (MOBILE HOME) MANUFACTURING) | Manufacturing | — | — | 3.0 yrs | 51.6 |
| Modern Materials | Industrial | — | — | 3.0 yrs | 51.6 |
| WILSON'S FERTILIZER & GRAIN CO. (OTHER ANIMAL FOOD MANUFACTURING) | Manufacturing | — | — | 3.0 yrs | 51.6 |
| Blacketor Drive Parcels | Industrial | — | — | 3.0 yrs | 51.6 |
| 527 Main | Industrial | — | — | 3.0 yrs | 51.6 |
| ROCHESTER METAL PRODUCTS CORP. (IRON FOUNDRIES) | Manufacturing | — | — | 3.0 yrs | 51.6 |
| Olympic Fiberglass Industries | Industrial | — | — | 3.0 yrs | 51.6 |
Former Finest Finishes: common questions
What is the DC Readiness score of Former Finest Finishes?
Former Finest Finishes scores 51.6/100 on the GridCensus DC Readiness scale, rated fair. It ranks 2nd of 57 scored sites in FULTON. The FULTON average is 51.5 and the Indiana average is 54.0.
Which electric utility serves Former Finest Finishes?
DUKE ENERGY INDIANA, LLC (investor owned) holds the retail service territory that contains the site; its holding company is DUKE ENERGY CORP.
What grid region is Former Finest Finishes in?
Former Finest Finishes is in the MISO region. Projects interconnecting there have averaged a 3.0-year wait from queue request to operation.
How far is Former Finest Finishes from an internet exchange?
The nearest internet exchange facility is Aunalytics South Bend Datacenter (AUSB), about 41.1 miles away; 6 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Former Finest Finishes, FULTON, IN”, https://gridcensus.com/datacenter-sites/indiana/fulton/former-finest-finishes-918c8f6d (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Former Finest Finishes, FULTON is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.