Skip to content
Gridcensus

UNKNOWN122874

Substation-Adjacent

FULTON, Indiana · PJM

DC Readiness
61.3
Good / 100

UNKNOWN122874 is a substation-adjacent datacenter candidate site in FULTON, Indiana, interconnecting through PJM. It screens at 61.3/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN122874
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW
UtilityDUKE ENERGY INDIANA, LLCinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth62
Avg queue wait3.8 yrs

Connectivity

Nearest IXPLigonier CO
IXP distance37.7 mi
Fiber providers6
Fiber coverage99.8%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score68/100

Location context

Nearest datacenterLigonier CO
DC distance37.7 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.24¢/kWh
Industrial electricity8.17¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$7,558

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN122874

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power20%
38
Fiber connectivity12%
69
Energy cost10%
50
Water risk7%
90
Natural hazard6%
68
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in FULTON, ranked by DC Readiness.

Sites near UNKNOWN122874
SiteTypeVoltageCapacityQueue waitScore
WILSON'S FERTILIZER & GRAIN CO. (OTHER ANIMAL FOOD MANUFACTURING)Manufacturing——3.5 yrs52.5
WILSON'S CORN PRODUCTS, INC. (WET CORN MILLING)Manufacturing——3.5 yrs52.4
ROCHESTER METAL PRODUCTS CORP. (IRON FOUNDRIES)Manufacturing——3.5 yrs52.4
MODULAR BUILDERS, INC. (PREFABRICATED WOOD BUILDING MANUFACTURING)Manufacturing——3.5 yrs52.4
MODERN MATERIALS, INC. (PAINT AND COATING MANUFACTURING)Manufacturing——3.5 yrs52.4
ROCHESTER SENTINEL CORP. (OTHER COMMERCIAL PRINTING)Manufacturing——3.5 yrs52.4
FULTON INDUSTRIES, INC. (MACHINE SHOPS)Manufacturing——3.5 yrs52.4
MACHINED CASTINGS SPECIALTIES, LLC (NOT AVAILABLE)Manufacturing——3.5 yrs52.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN122874, FULTON. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.