Skip to content
Gridcensus

ZACHARY CONFECTIONS, INC. (CONFECTIONERY MANUFACTURING FROM PURCHASED CHOCOLATE)

Manufacturing

Clinton County, Indiana

DC Readiness
53.4
Fair / 100

ZACHARY CONFECTIONS, INC. (CONFECTIONERY MANUFACTURING FROM PURCHASED CHOCOLATE) is a manufacturing datacenter candidate site in Clinton County, Indiana. It screens at 53.4/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

UtilityDUKE ENERGY INDIANA, LLCinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

Avg queue wait3.5 yrs

Connectivity

Nearest IXPWintek Corporation
IXP distance20.6 mi
Fiber providers9
Fiber coverage62.1%

Site characteristics

Site typeManufacturing

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score68/100

Location context

Nearest datacenterWintek Corporation
DC distance20.6 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.20¢/kWh
Industrial electricity8.21¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$9,492

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track ZACHARY CONFECTIONS, INC. (CONFECTIONERY MANUFACTURING FROM PURCHASED CHOCOLATE)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
51
Fiber connectivity12%
76
Energy cost10%
50
Water risk7%
90
Natural hazard6%
68
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Clinton County, ranked by DC Readiness.

Sites near ZACHARY CONFECTIONS, INC. (CONFECTIONERY MANUFACTURING FROM PURCHASED CHOCOLATE)
SiteTypeVoltageCapacityQueue waitScore
FRANKFORTSubstation-Adjacent230 kV300 MW3.8 yrs61.1
Greenfield (THORNTOWN - KOKOMO HIGHLAND PA)Greenfield230 kV300 MW3.8 yrs54.2
DSM NEO RESINS, INC. (NOT AVAILABLE)Manufacturing——3.5 yrs53.5
LEP SPECIAL FASTENERS (FASTENER, BUTTON, NEEDLE, AND PIN MANUFACTURING)Manufacturing——3.5 yrs53.5
EMERSON APPLIANCE CONTROLS (WATCH, CLOCK, AND PART MANUFACTURING)Manufacturing——3.5 yrs53.5
VICKSMETAL/ARMCO ASSOCS. (IRON AND STEEL MILLS)Manufacturing——3.5 yrs53.5
CUSTOM BUILDING PRODUCTS (CEMENT MANUFACTURING)Manufacturing——3.5 yrs53.5
DONALDSON COMPANY, INC. (AIR PURIFICATION EQUIPMENT MANUFACTURING)Manufacturing——3.5 yrs53.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ZACHARY CONFECTIONS, INC. (CONFECTIONERY MANUFACTURING FROM PURCHASED CHOCOLATE), Clinton County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.